Petrochemical |
Porta Cabin Office Complex
Sector |
Petrochemical |
Project Title |
Porta Cabin Office Complex |
Project Owner |
SADARA |
Client |
SADARA |
Department |
CSD |
Location |
Jubail |
Start Date |
01/05/16 |
End Date |
01/07/16 |
Scope of work |
The scope ofwork includes, construction of portable cabin, Single unit joint with two Porta Cabins,
|
|
SADARA |
Jubail |
01/05/16 |
01/07/16 |
Petrochemical |
Replacement of over head lines of dehydration Coulmns,
Sector |
Petrochemical |
Project Title |
Replacement of over head lines of dehydration Coulmns, |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/06/17 |
Scope of work |
The project scope is the replacement of the overhead lines of Dehydration columns 4C-1401/2/3/4/5 with SS Metallurgy. It involves the following activities:, Procurement of piping bulk material., Pre fabrication of piping and pipe supports., Painting, pickling and passivation for piping., Testing of pipe spools., Demolition of existing lines from dehydration columns 4C-1401/2/3/4/5., Installation and testing of new lines for dehydration columns 4C-1401/2/3/4/5., Tie-in connections.,The radiography will be conducted through SAFRAD and RSO will be present at the job site.,Scaffolding Erection.,nsulation installation.,Instruments works.,Ground preparation of crane.
|
|
SHARQ |
Jubail |
01/03/16 |
01/06/17 |
Petrochemical |
DOW Reverse OSMOSIS Water KSA Project – IT COMMUNICATION TOWER DISMANTLING
Sector |
Petrochemical |
Project Title |
DOW Reverse OSMOSIS Water KSA Project – IT COMMUNICATION TOWER DISMANTLING |
Project Owner |
SADARA |
Client |
Fluor |
Department |
CSD |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/04/16 |
Scope of work |
The project includes Disassembly and removal of IT Communications Tower, Dismantling of the Switch Cabinet, Dismantling of the wireless access point.
|
|
Fluor |
Jubail |
01/03/16 |
01/04/16 |
Petrochemical |
Scaffolding at SHARQ
Sector |
Petrochemical |
Project Title |
Scaffolding at SHARQ |
Project Owner |
SABIC / SHARQ |
Client |
NUQBAH INTERGRATED CONTRACTING |
Department |
SCF |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/04/16 |
Scope of work |
The scope includes supply of scaffolding Services at SHARQ/SABIC in Jubail
|
|
NUQBAH INTERGRATED CONTRACTING |
Jubail |
01/03/16 |
01/04/16 |
Petrochemical |
Fabrication and Welding Services (Annual rate contract) 9000000666 & 9000000405
Sector |
Petrochemical |
Project Title |
Fabrication and Welding Services (Annual rate contract) 9000000666 & 9000000405 |
Project Owner |
Tasnee |
Client |
Tasnee |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
June 2018 |
Scope of work |
To provide services for fabrication, Welding, Sanblasting and Painting to be executed on call basis by utilizing Contractor qualified resources when required by TASNEE
|
|
Tasnee |
Jubail |
01/03/16 |
June 2018 |
Petrochemical |
Electrical Heat Tracing at line P-133142-3 – HC87
Sector |
Petrochemical |
Project Title |
Electrical Heat Tracing at line P-133142-3 – HC87 |
Project Owner |
SADARA |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
25/04/16 |
End Date |
01/06/16 |
Scope of work |
The Scope of work includes Electrical Heat Tracing at line P-133142-3 – HC87( labour, material, tool & transportation to complete the work)
|
|
SADARA |
Jubail |
25/04/16 |
01/06/16 |
Oil & Gas |
Electrical & Instrumentation works at Abu Ali
Sector |
Oil & Gas |
Project Title |
Electrical & Instrumentation works at Abu Ali |
Project Owner |
Saudi Aramco |
Client |
Al-Toukhi Company |
Department |
E&I |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/07/17 |
Scope of work |
The Scope of work of the project is as follow:
Installation of equipment and cables.
Supply and installation of cable Ties for dressing cable.
Supply and installation of phenolic & SS-Tags for installed cables.
Erect /Dismantle scaffolds or use equipment for installation.
Testing of cables LV and MV cables.
|
|
Al-Toukhi Company |
Jubail |
01/03/16 |
01/07/17 |
Mining & Minerals |
Fabricaction, Construction, Erection and Installation of Waxer Unit in Rolling Mill
Sector |
Mining & Minerals |
Project Title |
Fabricaction, Construction, Erection and Installation of Waxer Unit in Rolling Mill |
Project Owner |
MA'ADEN |
Client |
MA'ADEN ALUMINIUM |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
01/02/16 |
End Date |
01/05/16 |
Scope of work |
The Scope of work includes Dismantling of existin equipment, Erection of structural steel wor, Installation of hydraulic equipment, Mobile crane operation, Scaffolding, Piping installation & installation of Waxer, Electrical installations( Cable Channels & Cable protection pipe) are also included in scope of work
|
|
MA'ADEN ALUMINIUM |
Ras Al-Khair |
01/02/16 |
01/05/16 |