| Petrochemical |
Construct New Chemical Storage Area
| Sector |
Petrochemical |
| Project Title |
Construct New Chemical Storage Area |
| Project Owner |
SABIC |
| Client |
SADAF |
| Department |
Civil |
| Location |
Jubail |
| Start Date |
01/01/16 |
| End Date |
01/04/16 |
| Scope of work |
This project involves construction of new chmical storage area with ramp; supply of material (permanent and consumable), tools, labors, equipment, supervision, mobilization & demobilization and miscellaneous services necessary to do the required work.
|
|
SADAF |
Jubail |
01/01/16 |
01/04/16 |
| Oil & Gas |
Request for Toruqe Tools
| Sector |
Oil & Gas |
| Project Title |
Request for Toruqe Tools |
| Project Owner |
SATORP |
| Client |
SATORP |
| Department |
BT |
| Location |
Jubail |
| Start Date |
22/02/16 |
| End Date |
01/04/16 |
| Scope of work |
To supply torque tools(Hydraulic torque wrenches) with the torque capacity as per requirement of Aramco.
|
|
SATORP |
Jubail |
22/02/16 |
01/04/16 |
| Metal |
Replacement of Steam Pipes CCM PPL T/A
| Sector |
Metal |
| Project Title |
Replacement of Steam Pipes CCM PPL T/A |
| Project Owner |
SABIC |
| Client |
HADEED |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/01/16 |
| End Date |
01/02/16 |
| Scope of work |
REPLACEMENT OF STEAM PIPES – DURING HADEED CMC TURANROUND
|
|
HADEED |
Jubail |
01/01/16 |
01/02/16 |
| Petrochemical |
Implementation of EG 1&2 and LAO MOCS
| Sector |
Petrochemical |
| Project Title |
Implementation of EG 1&2 and LAO MOCS |
| Project Owner |
SABIC |
| Client |
UNITED |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/01/16 |
| End Date |
01/03/17 |
| Scope of work |
Fabrication of spools,Hydrotesting of lines, disconnection and removal of instruments,modification of steel structure,installation of control valves and new lines, loopchecking, installation of new reboilers,installation of steam tracing, scaffolding and insulation
|
|
UNITED |
Jubail |
01/01/16 |
01/03/17 |
| Petrochemical |
Install standby one Re-Boiler For LP De-Ethaniser Column
| Sector |
Petrochemical |
| Project Title |
Install standby one Re-Boiler For LP De-Ethaniser Column |
| Project Owner |
SABIC / SHARQ |
| Client |
HKL Sadiq |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/01/16 |
| End Date |
01/05/16 |
| Scope of work |
•.Piping, Fabrication and site installation of one Re-Boiler For LP De-Ethaniser Column
•Supply of equipment required for the fabrication and installation
|
|
HKL Sadiq |
Jubail |
01/01/16 |
01/05/16 |
| Petrochemical |
Pressure Transmitter Insatallation PE 3&4 TAM
| Sector |
Petrochemical |
| Project Title |
Pressure Transmitter Insatallation PE 3&4 TAM |
| Project Owner |
SABIC |
| Client |
SHARQ |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/12/15 |
| End Date |
01/04/16 |
| Scope of work |
This project involves Pressure Transmitter Insatallation in plant PE 3&4 during the annual S/D.
|
|
SHARQ |
Jubail |
01/12/15 |
01/04/16 |
| Petrochemical |
Fabrication of Pipe Cold Support
| Sector |
Petrochemical |
| Project Title |
Fabrication of Pipe Cold Support |
| Project Owner |
SADARA |
| Client |
DAELIM |
| Department |
CSD |
| Location |
Jubail |
| Start Date |
01/11/15 |
| End Date |
01/12/15 |
| Scope of work |
Fabrication of Pipe Cold Support
|
|
DAELIM |
Jubail |
01/11/15 |
01/12/15 |
| Petrochemical |
Civil / Structural work
| Sector |
Petrochemical |
| Project Title |
Civil / Structural work |
| Project Owner |
SABIC / IBN ZAHR |
| Client |
Olayan Descon |
| Department |
Civil |
| Location |
Jubail |
| Start Date |
15/02/16 |
| End Date |
15/04/16 |
| Scope of work |
This project involves Civil / Structural work at SABIC affilizate Ibn Zahr
|
|
Olayan Descon |
Jubail |
15/02/16 |
15/04/16 |