Transportation & Infrastructure |
Subcontractor work for supply, delivey of different materials (School PA System, Master clock etc)
Sector |
Transportation & Infrastructure |
Project Title |
Subcontractor work for supply, delivey of different materials (School PA System, Master clock etc) |
Project Owner |
SATCO |
Client |
SATCO |
Department |
ISCS |
Location |
Jubail |
Start Date |
01/04/16 |
End Date |
01/08/16 |
Scope of work |
The scope of work includes supply and installation of Public Address system, Masterclock system, AV System, Data System, Telephone and Wireless system, IPTV System, BMS system, FIRE Alarm System.
|
|
SATCO |
Jubail |
01/04/16 |
01/08/16 |
Petrochemical |
Overhauling of Kobleco Compressors – Site Work – SPCO TA 2016
Sector |
Petrochemical |
Project Title |
Overhauling of Kobleco Compressors – Site Work – SPCO TA 2016 |
Project Owner |
Saudi Chevron |
Client |
Saudi Chevron |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/16 |
End Date |
01/11/16 |
Scope of work |
The scope of work includes Activities to remove the Compressor Rotors from Skid, Maintenance, Overhauling of compressors and installation of compressors on skid, presuure testing and comissioning.
|
|
Saudi Chevron |
Jubail |
01/10/16 |
01/11/16 |
Mining & Minerals |
Scaffolding Services LFC – MAC
Sector |
Mining & Minerals |
Project Title |
Scaffolding Services LFC – MAC |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
SCF |
Location |
Ras Al-Khair |
Start Date |
November 2015 |
End Date |
April 2019 |
Scope of work |
Provision of Scaffolding Services to MAC under Long Form Contract
|
|
Ma'aden Aluminium |
Ras Al-Khair |
November 2015 |
April 2019 |
Petrochemical |
Provide Scaffolding at PetroKemya
Sector |
Petrochemical |
Project Title |
Provide Scaffolding at PetroKemya |
Project Owner |
SABIC / PETROKEMYA |
Client |
IICS |
Department |
SCF |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/04/16 |
Scope of work |
The scope of work includes supply of scaffolding at PetroKemya Plant.
|
|
IICS |
Jubail |
01/03/16 |
01/04/16 |
Petrochemical |
Yanpet 1 F&G System Upgrade Project
Sector |
Petrochemical |
Project Title |
Yanpet 1 F&G System Upgrade Project |
Project Owner |
SABIC / YANPET |
Client |
SEPAM |
Department |
SCF |
Location |
Yanbu |
Start Date |
01/03/16 |
End Date |
01/08/16 |
Scope of work |
The scope of work includes Supply, Erection & Dismantle of the Scaffold Material as required by project schedule at YANPET F&G system Upgrade Project.
|
|
SEPAM |
Yanbu |
01/03/16 |
01/08/16 |
Petrochemical |
Install a stand by pump and level indication for storm water Lagoon
Sector |
Petrochemical |
Project Title |
Install a stand by pump and level indication for storm water Lagoon |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/12/16 |
Scope of work |
The project scope includes installation of standby pump and level indication in storm water lagoon. The brief scope of work is as below:
Design and detail engineering for installation of standby pump and level indicator, Procurement of pump, level transmitter, control panel, pipe, pipe fittings, and cables, Construction of civil foundation, rerouting of UPVC pipe and curb wall around pump area,Installation of new pump foundation.,Modification of SS piping.
Installation of new piping, valves and strainer.,Installation of new radar level transmitter.,Installation of new control panel.,Installation of cables.,Scaffolding erection.,Testing, commissioning and DCS configuration
|
|
SAFCO |
Jubail |
01/03/16 |
01/12/16 |
Petrochemical |
Porta Cabin Office Complex
Sector |
Petrochemical |
Project Title |
Porta Cabin Office Complex |
Project Owner |
SADARA |
Client |
SADARA |
Department |
CSD |
Location |
Jubail |
Start Date |
01/05/16 |
End Date |
01/07/16 |
Scope of work |
The scope ofwork includes, construction of portable cabin, Single unit joint with two Porta Cabins,
|
|
SADARA |
Jubail |
01/05/16 |
01/07/16 |
Petrochemical |
Replacement of over head lines of dehydration Coulmns,
Sector |
Petrochemical |
Project Title |
Replacement of over head lines of dehydration Coulmns, |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/16 |
End Date |
01/06/17 |
Scope of work |
The project scope is the replacement of the overhead lines of Dehydration columns 4C-1401/2/3/4/5 with SS Metallurgy. It involves the following activities:, Procurement of piping bulk material., Pre fabrication of piping and pipe supports., Painting, pickling and passivation for piping., Testing of pipe spools., Demolition of existing lines from dehydration columns 4C-1401/2/3/4/5., Installation and testing of new lines for dehydration columns 4C-1401/2/3/4/5., Tie-in connections.,The radiography will be conducted through SAFRAD and RSO will be present at the job site.,Scaffolding Erection.,nsulation installation.,Instruments works.,Ground preparation of crane.
|
|
SHARQ |
Jubail |
01/03/16 |
01/06/17 |