Water |
Product Water By-Pass Header for Marafiq & SWCC Export Lines
Sector |
Water |
Project Title |
Product Water By-Pass Header for Marafiq & SWCC Export Lines |
Project Owner |
MARAFIQ |
Client |
JWAP |
Department |
CSD |
Location |
Jubail |
Start Date |
July 2019 |
End Date |
March 2020 |
Scope of work |
The scope of work includes Design & Engineering, Procurement, Construction / Installation, Testing, Pre-Commissioning for all Pipes, Equipment, Cabling, Structures & Supports for completion of the project. The brief scope of work includes, Procurement of Piping & Valves, Fabrication works, Cement Lining Works, Painting & Coating, Erection & Installation of Piping & Supports, NDT, Installation of Valves, Tie-Ins, Hydrostatic Testing, Site Surveying, Demolition of Existing Pavement, Excavation, Lean Concrete, Disposing, Reinstatement of Pavement, Civil Foundation, Construction of Valve Chamber, Laying of cables & Termination, Tube & Fittings, Earthing of Equipments, Testing & Commissioning.
|
|
JWAP |
Jubail |
July 2019 |
March 2020 |
Mining & Minerals |
Installation of New Seed Filtrate Pump (461F-PUFI-1171)
Sector |
Mining & Minerals |
Project Title |
Installation of New Seed Filtrate Pump (461F-PUFI-1171) |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
Sept-2019 |
End Date |
May-2020 |
Scope of work |
The scope of work is to install new pump (461F-PUFI-1171) of same sizing (12/10 with 400 Kw) in current Seed Filtrate pumps Circuit. It involves several activities such as construction of new foundation, trench, temporary bund wall, installation of new supports, modification of existing supports. It also includes Fabricatation and installation of new Nozzels, suction and discharge piping, valves and Extension of gland water piping to new Pump location. It also includes supply and installation of power cables, grounding cables, VSD, ACB, Bus-ties, profibus cable, and testing and commissioning of the activities.
|
|
Ma'aden Aluminium |
Ras Al-Khair |
Sept-2019 |
May-2020 |
Petrochemical |
Supply of Blast Proof Porta-cabins & Ablution Units for EGDMC Plant SD’2020, SAUDI KAYAN
Sector |
Petrochemical |
Project Title |
Supply of Blast Proof Porta-cabins & Ablution Units for EGDMC Plant SD’2020, SAUDI KAYAN |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
RGSS |
Location |
Jubail |
Start Date |
Dec-2019 |
End Date |
Mar-2020 |
Scope of work |
The scope of work is to provide Blast / Explosion proof porta-cabins (units) along with ablution units, diesel generators, normal porta-cabins along with the provision of diesel fuel and operators.
|
|
SAUDI KAYAN |
Jubail |
Dec-2019 |
Mar-2020 |
Oil & Gas |
Valve Inspection and Valve Overhaul Works for PRC 2020 Turn Around Project
Sector |
Oil & Gas |
Project Title |
Valve Inspection and Valve Overhaul Works for PRC 2020 Turn Around Project |
Project Owner |
Petro Rabigh |
Client |
GS E & C |
Department |
TSD |
Location |
Yanbu |
Start Date |
Nov-2019 |
End Date |
Apr-2020 |
Scope of work |
The project scope consists of two activities. These are:
Inspection and Stroke test:
1. Disconnect/Install instrument and electrical connections of valves that require overhauling.
2. Field stroke test of valves by using Fluke valve testers.
3. Diesel Generator for the electrical actuator stroke test.
Overhauling activities:
1. Cleaning of Valve before dismantling for removing of chemical contamination.
2. Dismantling of valve and Cleaning of trim parts.
3. Lapping of Body seats, disc/ball seat and Assembly of Valve.
4. Hydro testing of valve as per API 598 and ANSI FCI 70-2.
5. Preparation of hydro test report of valve.
|
|
GS E & C |
Yanbu |
Nov-2019 |
Apr-2020 |
Oil & Gas |
Rental/Supply/Services of Miscellaneous Tools for Bolt Torquing for Turn Around 2020
Sector |
Oil & Gas |
Project Title |
Rental/Supply/Services of Miscellaneous Tools for Bolt Torquing for Turn Around 2020 |
Project Owner |
Petro Rabigh |
Client |
GS E & C |
Department |
BT |
Location |
Yanbu |
Start Date |
Dec-2019 |
End Date |
Apr-2020 |
Scope of work |
The scope of work is to carry-out bolt torquing and tensioning activities for the PetroRabig company (PRC) T/A 2020. It also involes provision of Hydraulic Winch, Flange Spreader, nut splitter and serration activities on required basis.
|
|
GS E & C |
Yanbu |
Dec-2019 |
Apr-2020 |
Petrochemical |
Supply of Heaters for SADARA
Sector |
Petrochemical |
Project Title |
Supply of Heaters for SADARA |
Project Owner |
SADARA |
Client |
Sadara |
Department |
E&I |
Location |
Jubail |
Start Date |
Nov-2019 |
End Date |
Mar-2020 |
Scope of work |
The scope of work is to supply Circulation heater for nitrogen gas c/w. It has features of:
– 2” fiber glass thermal insulation encased in painted steel jacket
– ANSI 1”-150lb SORF flanged inlet & outlet nozzle.
|
|
Sadara |
Jubail |
Nov-2019 |
Mar-2020 |
Petrochemical |
Independent Line for PK BoG Project // PK Tail Gas Pgase II // MOC-5471, SP-191400011
Sector |
Petrochemical |
Project Title |
Independent Line for PK BoG Project // PK Tail Gas Pgase II // MOC-5471, SP-191400011 |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
PSD |
Location |
Jubail |
Start Date |
Nov-2019 |
End Date |
Apr-2020 |
Scope of work |
The scope of work is procurement, fabrication, installation of piping, electrical, instrumentaiton, civil, structural, and architectural works for the PK Tail Gas Project. It invlves demolition of existing lines, installation of modified lines, control valves, pipe supports, NDE, RT and PT. It also includes suppply of power for CP, associated instruments, pressure transmitters, excavation & backfilling for U/G pipes, steel structures as well as asphalt concrete paving road works.
|
|
Ar-Razi |
Jubail |
Nov-2019 |
Apr-2020 |
Petrochemical |
Consolidated Design Gap Rectification Modifications
Sector |
Petrochemical |
Project Title |
Consolidated Design Gap Rectification Modifications |
Project Owner |
SADARA |
Client |
Sadara |
Department |
E&I |
Location |
Jubail |
Start Date |
Nov-2019 |
End Date |
May-2020 |
Scope of work |
The scope of work is design, engineering (by OEM), procurement, suppply and installation of EHT materials. It also includes installation of Heating Tracing System on Polyols Pipeline, Power JBs, RTD sensor, DP power, splice kit for T0joints, binding tapes, conduits, trays, cable glands, new insulations, cladding, scaffodling, and as well as testing and commissioning services for the installed items.
|
|
Sadara |
Jubail |
Nov-2019 |
May-2020 |