To Install Pressure Transmitter with Rubber Melt Tube
05-23-2020 | Posted inScope of work includes installation of pressure transmitter with a rubber melt tube that will cover specific pipes of the Hydrogen area of PE1&2 plants, along with internal wiring to DCS components and to annunciator alarm in the operation console.
Read MoreOverhauling of Misc. Rotary Equipment -SPCO T/A 2016
05-23-2020 | Posted inScope of work includes Miscellaneous Rotary works such as repair & maintenance work on Rotary equipments like Agitator assemblies, Reactor coolant Pumps & Dryers for SPCO South Plants during forthcoming Turnaround 2016.
Read MoreSubcontractor work for supply, delivey of different materials (School PA System, Master clock etc)
05-23-2020 | Posted inThe scope of work includes supply and installation of Public Address system, Masterclock system, AV System, Data System, Telephone and Wireless system, IPTV System, BMS system, FIRE Alarm System.
Read MoreOverhauling of Kobleco Compressors – Site Work – SPCO TA 2016
05-23-2020 | Posted inThe scope of work includes Activities to remove the Compressor Rotors from Skid, Maintenance, Overhauling of compressors and installation of compressors on skid, presuure testing and comissioning.
Read MoreProvide Scaffolding at PetroKemya
05-23-2020 | Posted inThe scope of work includes supply of scaffolding at PetroKemya Plant.
Read MoreYanpet 1 F&G System Upgrade Project
05-23-2020 | Posted inThe scope of work includes Supply, Erection & Dismantle of the Scaffold Material as required by project schedule at YANPET F&G system Upgrade Project.
Read MoreInstall a stand by pump and level indication for storm water Lagoon
05-23-2020 | Posted inThe project scope includes installation of standby pump and level indication in storm water lagoon. The brief scope of work is as below: Design and detail engineering for installation of standby pump and level indicator, Procurement of pump, level transmitter, control panel, pipe, pipe fittings, and cables, Construction of civil...
Read MorePorta Cabin Office Complex
05-23-2020 | Posted inThe scope ofwork includes, construction of portable cabin, Single unit joint with two Porta Cabins,
Read More