Electrical works for MP-EVA0-B-01-04-61 -Ethylene Pump at EVA plant.
05-23-2020 | Posted inScope of work includes • Erection / dismantling of scaffolding along with existing pipe rack. • 3 Runs, 440 meters of 3CX150mm2 power cable will be laid on existing cable tray/ladders from MCC panel to the consumer junction box. • 1 Run, 440 meter of 5CX2.5mm2 control cable will be...
Read MoreEmergency Work for KV-592642 ; ASU KV Forward Plan
05-23-2020 | Posted inScope of work includes 1. Unbolting of old valve, 2. Removal of old valve by Crane (160 Ton), 3.Cleaning of flange faces, 4.New valve KV-592642 mobilization from Temal workshop to site, 5.Valve KV-592642 installation by crane, 6.Gasket installation and manual bolt tightening, 7.Torquing
Read MoreSADAF Plant 74SS1 switchgear enclosure and telemetry system upgrade
05-23-2020 | Posted inScope of work includes MV & LV Power and Control Cable Termination, Supply of all necessary termination accessories like sleeves, lugs, tags & ferrules, Laying and terminating the Grounding wire & grounding conductor , Dismantling Existing PEC and Moving the associated Equipment (MV SWGR, LV SWGR, Telemetry Panel, Dry Type...
Read MoreElectric Heat Tracing Services
05-23-2020 | Posted inMaintenance of Electric heat tracing System,To provide Inventory spare parts for each system. To provid Engineering Design Package for any modifications supported with required statndars & Drawings.To perform Through maintenance checkup for each System
Read MoreFilter Foundation work YANPET U10 CSU PROJECT
05-23-2020 | Posted inScope of work includes Earth work( Site preparation Excavation (including Concrete Paving Demolition), Back Fill & Compaction,Disposal). Concrete Work(Structural Concrete,Lean Concrete,Form Work For Foundation, Re-Bar,Non-Shrinkage Grout (for Steel structure work),Joint & Sealant) & Coating Wok
Read MoreCivil Work for EO Sales Gas Filter Project
05-23-2020 | Posted inTHIS PROJECT JOB SCOPE COVERS Pipe lines fabrication and installation work of Sales Gas Filter at SADARA EO Plant. Removal of existing temporary structure, Concrete Work and Installation of Pedestals
Read MoreInstallation of C20 Filter to capture Polymer LAO (Linear alpha olifines)
05-23-2020 | Posted inDuring LAO plant T/A, Following activities were performed, Design, Engineering, Supply, Installation,Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product. along with associated site works including Piping, Fabrication, Welding, Civil/ structural Work for routing of pipes and...
Read MoreCIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
05-23-2020 | Posted inCIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
Read More