Petrochemical |
1EG Piping and Valves Repair Works (Area12&14)
Sector |
Petrochemical |
Project Title |
1EG Piping and Valves Repair Works (Area12&14) |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/12/15 |
Scope of work |
Project involves repair of piping and valves in 1EG plant during 2015 TAM. The scope involves pre-fabrication activities, Tagging of jobs, Radiography & toucup painting,
|
|
SHARQ |
Jubail |
01/06/15 |
01/12/15 |
Petrochemical |
Thermal Exp. Vessel construction
Sector |
Petrochemical |
Project Title |
Thermal Exp. Vessel construction |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/08/16 |
Scope of work |
Project scope includes Engineering, procurement, supply, installation, testing and pre commissioning of new EO Thermal expansion vessel at SAUDI KAYAN Plant. The brief scope includes Design and detail engineering works for new EO Thermal expansion vessel installation, Supply of 01 EO Thermal expansion vessel, related piping and instruments, Civil foundation works for New EO Thermal expansion vessel, Supply, fabrication, erection and modification of piping, Painting and insulation works, Cable laying for instruments, Provision of instruments stanchions, transmitter sun shade and tube fittings, Configure new AO Card in the system, DCS Configuration & Scaffolding
|
|
SAUDI KAYAN |
Jubail |
01/06/15 |
01/08/16 |
Petrochemical |
Flame Scanner in Olefins Plant
Sector |
Petrochemical |
Project Title |
Flame Scanner in Olefins Plant |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/01/16 |
Scope of work |
Project involves Design and Detailed Engineering, of Upgradation of Replacing UV-IR type Flame Scanner. Procure Flame Scanner, Instrument Cables, involving Dismantling & Installation of Flame Scanner, Cabling with JB’s, DCS and BMS configuration, Testing & Commissioning.
|
|
SHARQ |
Jubail |
01/05/15 |
01/01/16 |
Metal |
Dismantling, Mechanical Installation, Installation Utility Equipment and Piping CCM & WTP HADEED SPLP1 – Upgradation of CCM3
Sector |
Metal |
Project Title |
Dismantling, Mechanical Installation, Installation Utility Equipment and Piping CCM & WTP HADEED SPLP1 – Upgradation of CCM3 |
Project Owner |
SABIC / HADEED |
Client |
SAUDI VOEST - ALPINE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/01/16 |
Scope of work |
Project involves:-
• Provision of Temporary facilities.
• Dismantling & Installation of Steel Structure.
• Removal & Erection of Mechanical Equipment.
• Removal / Installation of Piping & Utility Equipment along with modification in existing system.
|
|
SAUDI VOEST - ALPINE |
Jubail |
01/06/15 |
01/01/16 |
Petrochemical |
Upgrade Transformers 6 & 7 with Power Cables
Sector |
Petrochemical |
Project Title |
Upgrade Transformers 6 & 7 with Power Cables |
Project Owner |
SABIC |
Client |
AL-BAYRONI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/12/15 |
Scope of work |
Project involves Design and Detailed Engineering of upgradation of transformers, Removal & Installation of Transformer shed, Dismantling & Installation of New Transformer, Modification of New Civil Foundation and Roof structural works including dismantling of existing 1.5MVA Transformer, LV bus duct, Relay setting for upstream and downstream, Testing & Commissioning.
|
|
AL-BAYRONI |
Jubail |
01/05/15 |
01/12/15 |
Petrochemical |
MP & LP steam line form utility to UGAA plant
Sector |
Petrochemical |
Project Title |
MP & LP steam line form utility to UGAA plant |
Project Owner |
SABIC |
Client |
SAFCO |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/15 |
End Date |
01/05/16 |
Scope of work |
The project involves installation of MP and LP steam lines from SF2 for UGAA plant, including Design & Detailed Engineering, Procurement of material, Installation of 3″ MP steamline & Installation of 4″ LP steamline, Scaffolding works, INsulation works, painting, sand blasting, Testing & Commissioning
|
|
SAFCO |
Jubail |
01/06/15 |
01/05/16 |
Petrochemical |
Cooling Water Pump (X-201J-A/B) & U-200J/A) Piping 3D TRACER ONLINE ANALYZERS
Sector |
Petrochemical |
Project Title |
Cooling Water Pump (X-201J-A/B) & U-200J/A) Piping 3D TRACER ONLINE ANALYZERS |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/15 |
End Date |
01/08/15 |
Scope of work |
Project involves Design, Engineering & Installation of 3D Tracer along with steel structure shed, civil foundation, related PVC piping and E&I work.
|
|
IBN AL-BAYTAR |
Jubail |
01/04/15 |
01/08/15 |
Petrochemical |
Preventing air entry to Flare Header
Sector |
Petrochemical |
Project Title |
Preventing air entry to Flare Header |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/11/15 |
Scope of work |
Project involves Design, Procurement of Material, Installation of Valves, Testing & Commissioning including Supply and Installation of Valves, Digital JB’s (EExd), DI DCS Modules along with Scaffolding activities.
|
|
SHARQ |
Jubail |
01/05/15 |
01/11/15 |