Oil & Gas |
SFC-for Bolt Torqueing activities at 474 Tr 200
Sector |
Oil & Gas |
Project Title |
SFC-for Bolt Torqueing activities at 474 Tr 200 |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
BT |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/01/17 |
Scope of work |
Bolt Torquing & Tensioning Services at BGP during the T&I
|
|
Berri Gas Plant |
Jubail |
01/06/16 |
01/01/17 |
Petrochemical |
Design of Temporary Support Project
Sector |
Petrochemical |
Project Title |
Design of Temporary Support Project |
Project Owner |
SABIC |
Client |
YANPET |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/06/16 |
End Date |
01/01/16 |
Scope of work |
The Scope Includes,
To design the temporary supports to with stand the load of pipes (live load), To remove the existing civil support &To fabricate, supply & Install the temporary support at the location.
|
|
YANPET |
Yanbu |
01/06/16 |
01/01/16 |
Oil & Gas |
Electrical PM works for Power Transformer of desalter V171 during 2017 CFS @ RRD
Sector |
Oil & Gas |
Project Title |
Electrical PM works for Power Transformer of desalter V171 during 2017 CFS @ RRD |
Project Owner |
Saudi Aramco |
Client |
Riyadh Refinery |
Department |
TNC |
Location |
Riyadh |
Start Date |
01/06/16 |
End Date |
01/05/17 |
Scope of work |
The brief scope of work is as below:
To provide all supervision, manpower, equipment, tools and test instrument. To Perform initial inspection of the electrical connection system especially related to the condition of the transformers and bushing connections. To Replace insulation oil of the power transformers, To Dismantle electric insulators and replace with new ones.To Remove the electrical entrance bushing from the bushing housing and replace it. To Reinstall all power and control cable of the desalter transformer.Pre-commission the transformers as per SAUDI ARAMCO procedures.
|
|
Riyadh Refinery |
Riyadh |
01/06/16 |
01/05/17 |
Mining & Minerals |
Seed Filtrate Project at MAC
Sector |
Mining & Minerals |
Project Title |
Seed Filtrate Project at MAC |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
01/06/16 |
End Date |
01/07/16 |
Scope of work |
The job includes
Material Procurement, Piping Fabrication & Erection(including Pipe supports), Structural Works, Site NDT(RT & MPI), PWHT, Testing & Commissioning. Flanged Connections, Cutting , Welding, Grating & beam Connection.
|
|
Ma'aden Aluminium |
Ras Al-Khair |
01/06/16 |
01/07/16 |
Oil & Gas |
TANAJIB Sour Gas Handling and Compression – TANAJIB Project
Sector |
Oil & Gas |
Project Title |
TANAJIB Sour Gas Handling and Compression – TANAJIB Project |
Project Owner |
Saudi Aramco |
Client |
Target Engneering |
Department |
Civil |
Location |
Tanajib |
Start Date |
01/06/16 |
End Date |
01/02/18 |
Scope of work |
The brief scope of work is as below:
Demolition Works, Excavation and Backfilling, Roads and Paving, Fence and Gates, Concrete Works, Equipment Foundations,Fence and Wall Foundations, Pipe rack and Pipe Supports, Drainage Systems, Sanitary holding tank,
Sanitary Sewer, Oily Water Sewer (OWS), Catch Basin and Clean out, Substation building, New UPS Room,
Concrete Culvert, Civil Work for electrical items Buried Cables, Duct Bank, Street pole foundation, pedestal
Fire water line Civil Works, Pilot Trenchg
|
|
Target Engneering |
Tanajib |
01/06/16 |
01/02/18 |
Petrochemical |
Port Electricity Project
Sector |
Petrochemical |
Project Title |
Port Electricity Project |
Project Owner |
AMINAT |
Client |
AMINAT |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/08/16 |
Scope of work |
The job includes: LV Cable Glanding & termination at Aminat and SAMAPCO substation, Supply & Installation of Cable Gland/Lugs/Cable Tags, ferrules. Continuity/megger test.,To perform all the work as per International Standards.
|
|
AMINAT |
Jubail |
01/06/16 |
01/08/16 |
Petrochemical |
INSTALLATION OF SECURITY LIGHTING POST FOR DAELIM KEMYA
Sector |
Petrochemical |
Project Title |
INSTALLATION OF SECURITY LIGHTING POST FOR DAELIM KEMYA |
Project Owner |
SABIC / KEMYA |
Client |
DAELIM |
Department |
CSD |
Location |
Jubail |
Start Date |
01/09/16 |
End Date |
01/11/16 |
Scope of work |
The Scope of Work includes
Mobilization of necessary manpower, equipment, tools & consurnables.
Installation of 40 Sets Security Fencing Lighting Post,
Cable Pulling with Termination, & Steel Support Fabrication
|
|
DAELIM |
Jubail |
01/09/16 |
01/11/16 |
Petrochemical |
CIVIL MAINTENANCE SERVICES – (ITB-CON-S023)
Sector |
Petrochemical |
Project Title |
CIVIL MAINTENANCE SERVICES – (ITB-CON-S023) |
Project Owner |
SIPCHEM |
Client |
SIPCHEM |
Department |
Civil |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/06/19 |
Scope of work |
This is a long form contract (LFC) For 3 Years and Extendable. The Project Includes
Excavation, Backfilling Including Compaction, Concreting Works (Includes Mixing, Pouring/Placing And Curing), Grouting, Water Proofing, Finishing, Supply And Install (PVC And GI Pipes For Cold And Hot Water Supply With All Corresponding Fittings, Tiles And Marbles Includes Adhesives, Skirting, Electrical Fixtures And Accessories, Doors And Windows With Complete Accessories).
|
|
SIPCHEM |
Jubail |
01/06/16 |
01/06/19 |