Petrochemical |
Construction of Ammonia and Urea Operator Cabin
Sector |
Petrochemical |
Project Title |
Construction of Ammonia and Urea Operator Cabin |
Project Owner |
SABIC |
Client |
Safco |
Department |
Civil |
Location |
Jubail |
Start Date |
01/10/16 |
End Date |
01/01/17 |
Scope of work |
The scope includes Design, Procurement, Construction of Ammonia & Urea Operator Cabin. Specialized Manpower like Fabricator, Steel Fixer, Rigger & Carpenter were involved in the job.
|
|
Safco |
Jubail |
01/10/16 |
01/01/17 |
Petrochemical |
Filter Foundation work YANPET U10 CSU PROJECT
Sector |
Petrochemical |
Project Title |
Filter Foundation work YANPET U10 CSU PROJECT |
Project Owner |
SABIC / YANPET |
Client |
eTEC Arabia |
Department |
CSD |
Location |
Yanbu |
Start Date |
01/09/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes Earth work( Site preparation Excavation (including Concrete Paving Demolition), Back Fill & Compaction,Disposal). Concrete Work(Structural Concrete,Lean Concrete,Form Work For Foundation, Re-Bar,Non-Shrinkage Grout (for Steel structure work),Joint & Sealant) & Coating Wok
|
|
eTEC Arabia |
Yanbu |
01/09/16 |
01/12/16 |
Oil & Gas |
MISC & MOC EXECUTION WORKS at YASREF Facility
Sector |
Oil & Gas |
Project Title |
MISC & MOC EXECUTION WORKS at YASREF Facility |
Project Owner |
YASREF |
Client |
YASREF |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/10/16 |
End Date |
01/04/17 |
Scope of work |
The project scope includes
Pipes and Valve Fittings, Blinding, De-blinding, Measuring, cutting, grinding,welding, threading,pipefitting and installing pipes up to 56″ inches diameter, Install and remove valves up to 56″ inches diameter, Cold cutting of piping, as required.,Pre and Post Weld Heat Treatment,Painting, Cleaning and Grit Blasting, Insulation Work,Scaffolding – Design, supply, erection, and dismantling of scaffolding. Fireproofing, Rotary Equipment Work, Electrical & Instrumentation Work.
|
|
YASREF |
Yanbu |
01/10/16 |
01/04/17 |
Oil & Gas |
BOLT TENSIONING & ON-SITE MACHINING (02 years contract)
Sector |
Oil & Gas |
Project Title |
BOLT TENSIONING & ON-SITE MACHINING (02 years contract) |
Project Owner |
Saudi Aramco |
Client |
Khursaniyah Gas Plant |
Department |
BT |
Location |
Khursaniyah |
Start Date |
01/08/16 |
End Date |
01/01/18 |
Scope of work |
Bolt Torquing & Tensioning Services for Khursniyah Gas Plant for a period of two years contract
|
|
Khursaniyah Gas Plant |
Khursaniyah |
01/08/16 |
01/01/18 |
Petrochemical |
Civil Work for EO Sales Gas Filter Project
Sector |
Petrochemical |
Project Title |
Civil Work for EO Sales Gas Filter Project |
Project Owner |
Sadara |
Client |
SADARA |
Department |
Civil |
Location |
Jubail |
Start Date |
01/08/16 |
End Date |
01/09/16 |
Scope of work |
THIS PROJECT JOB SCOPE COVERS
Pipe lines fabrication and installation work of Sales Gas Filter at SADARA EO Plant. Removal of existing temporary structure, Concrete Work and Installation of Pedestals
|
|
SADARA |
Jubail |
01/08/16 |
01/09/16 |
Petrochemical |
Installation of C20 Filter to capture Polymer LAO (Linear alpha olifines)
Sector |
Petrochemical |
Project Title |
Installation of C20 Filter to capture Polymer LAO (Linear alpha olifines) |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/16 |
End Date |
01/12/16 |
Scope of work |
During LAO plant T/A, Following activities were performed,
Design, Engineering, Supply, Installation,Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product. along with associated site works including Piping, Fabrication, Welding, Civil/ structural Work for routing of pipes and cables covered under this project , Removal and reinstallation of Electrical heat tracing. Installation of instruments, Supply and laying signal cable, Loop check for all the instruments
|
|
UNITED |
Jubail |
01/08/16 |
01/12/16 |
Petrochemical |
Electrical and Instrumentation Construction job for FSTF Project
Sector |
Petrochemical |
Project Title |
Electrical and Instrumentation Construction job for FSTF Project |
Project Owner |
Sadara |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
03/08/16 |
End Date |
01/04/17 |
Scope of work |
The scope Contract include: design and engineering services for modifications and repair of the heat tracing systems as well as delivery of the following components and services:
Heat Tracing Design Sheet & Load schedule Schematic/Block Diagrams Panel Single line diagrams Panel Wiring Diagram Datasheets and Catalogues Inspection & Test Plans. Test Certificates & Certificate of Conformity along with ITP. Packing List with detailed shipping information Thermon HTSX Self Regulating Heating Cables Terminator Junction Boxes Accessories for Heat Tracing Systems Thermon PETK Termination Kits Installation of heat tracing material
|
|
SADARA |
Jubail |
03/08/16 |
01/04/17 |
Petrochemical |
Hexane Unloading facility
Sector |
Petrochemical |
Project Title |
Hexane Unloading facility |
Project Owner |
SABIC |
Client |
Yansab |
Department |
PSD |
Location |
Yanbu |
Start Date |
31/07/16 |
End Date |
01/01/17 |
Scope of work |
To Provide unloading Facility for HEXANE ISO container using existing pump. Also Procurement of material, Fabrication & Installation of Nitrogen, Hexane Lines 7 Drain lines.Hydrotesting.Scaffolding.Pre commissioning activities.
|
|
Yansab |
Yanbu |
31/07/16 |
01/01/17 |