Petrochemical |
Lifting Beam with Trolley in Manturbo Shed
Sector |
Petrochemical |
Project Title |
Lifting Beam with Trolley in Manturbo Shed |
Project Owner |
Advanced Petrochmemical Company |
Client |
Advanced Petrochmemical Company |
Department |
PSD |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/02/18 |
Scope of work |
Scope of work includes field engineering like floor activites, field route changes to modify the platform, trolley for gear box so that it can be removed during the TAM for the removel and re-installation of compressor casing. It also includes NDT, welding and other related activities.
|
|
Advanced Petrochmemical Company |
Jubail |
01/11/17 |
01/02/18 |
Metal |
Installation of De-dusting System in Oxide Tunnel of Module A/B – SP-162100001
Sector |
Metal |
Project Title |
Installation of De-dusting System in Oxide Tunnel of Module A/B – SP-162100001 |
Project Owner |
SABIC |
Client |
HADEED |
Department |
Installation of De-dusting System in Oxide Tunnel of Module A/B - SP-162100001 |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/02/19 |
Scope of work |
Scope of work includes Mechncial, civil, electrical and instrumentation works for Design, engineering, supply, installation, testing and commissioning assistance of a new de-dusting system for the oxide tunnel feeders and the conveyor system of Direct Reduction Module AB Plant at Hadeed.
|
|
HADEED |
Jubail |
01/11/17 |
01/02/19 |
Petrochemical |
Plant Support Services for all Sabic Affiliates – Master Agreement (LFC)
Sector |
Petrochemical |
Project Title |
Plant Support Services for all Sabic Affiliates – Master Agreement (LFC) |
Project Owner |
SABIC |
Client |
SABIC Global |
Department |
HRS |
Location |
KSA |
Start Date |
01/11/17 |
End Date |
01/11/22 |
Scope of work |
Scope of work includes provision of skilled manpower for all Sabic affiliates (Jubail/Yanbu) for the established long-form contract
|
|
SABIC Global |
KSA |
01/11/17 |
01/11/22 |
Oil & Gas |
Flange Facing (Machining) for EPC 10 & 11 at JRTP – T2220
Sector |
Oil & Gas |
Project Title |
Flange Facing (Machining) for EPC 10 & 11 at JRTP – T2220 |
Project Owner |
SAUDI ARAMCO / JAZAN |
Client |
Tecnicas Reunidas |
Department |
BT |
Location |
Jazan |
Start Date |
01/11/17 |
End Date |
01/03/18 |
Scope of work |
Scope of work includes hire of manpower and equipment to carry out in-situ flange facing / re-facing services to be performed at Jazan Refinery and Terminal Project at EPC 10 & 11
|
|
Tecnicas Reunidas |
Jazan |
01/11/17 |
01/03/18 |
Petrochemical |
Upgradation of PLC System in Existing Packaging Lines at Yanpet
Sector |
Petrochemical |
Project Title |
Upgradation of PLC System in Existing Packaging Lines at Yanpet |
Project Owner |
SABIC / Yanpet |
Client |
Golden Wing |
Department |
BAS |
Location |
Yanbu |
Start Date |
01/11/17 |
End Date |
01/06/18 |
Scope of work |
Scope of work includes PLC (S5-S7) upgrade with visualization system installation of 6 lines of packaging machine field installation at Yanpet plant
|
|
Golden Wing |
Yanbu |
01/11/17 |
01/06/18 |
Petrochemical |
IBB Switchyard Insulator Cleaning
Sector |
Petrochemical |
Project Title |
IBB Switchyard Insulator Cleaning |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
Electrical Maintenance, Testing & Commissioning Services |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/10/17 |
Scope of work |
Project scope consist of washing of 230 kV Substation outdoor RTV Coated Bushing/Insulators (totals=@70 Nos) with DM water. Cleaning of insulators with low pressure hydro jet pump and hand wiped with soft cloth choked with DM water without damaging the RTV coating.
|
|
IBN AL-BAYTAR |
Jubail |
01/10/17 |
01/10/17 |
Oil & Gas |
SFC: 474-TR-400 SFC FOR Bolt Torquing
Sector |
Oil & Gas |
Project Title |
SFC: 474-TR-400 SFC FOR Bolt Torquing |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
BT |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/01/18 |
Scope of work |
Scope of work includes bolt torquing services for T&I for the area 474-TR-400
|
|
Berri Gas Plant |
Jubail |
01/10/17 |
01/01/18 |
Oil & Gas |
SFC: 474-TR-600 SFC FOR Bolt Torquing
Sector |
Oil & Gas |
Project Title |
SFC: 474-TR-600 SFC FOR Bolt Torquing |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
BT |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/01/18 |
Scope of work |
Scope of work includes bolt torquing services for T&I for the area 474-TR-600
|
|
Berri Gas Plant |
Jubail |
01/10/17 |
01/01/18 |