Oil & Gas |
Hydraulic Bolt Torqueing T-2220 JRT Project
Sector |
Oil & Gas |
Project Title |
Hydraulic Bolt Torqueing T-2220 JRT Project |
Project Owner |
Saudi Aramco |
Client |
Tecnicas Reunidas |
Department |
BT |
Location |
Jazan |
Start Date |
01/08/17 |
End Date |
01/03/18 |
Scope of work |
Scope of work includes hire of manpower and equipment to carry out hydraulic bolt torqueing to be done at Jazan Refinery and Terminal Project
|
|
Tecnicas Reunidas |
Jazan |
01/08/17 |
01/03/18 |
Petrochemical |
Structural & Piping Fabrication Jobs
Sector |
Petrochemical |
Project Title |
Structural & Piping Fabrication Jobs |
Project Owner |
SABIC |
Client |
Specialty Chem |
Department |
PSD |
Location |
Jubail |
Start Date |
01/11/17 |
End Date |
01/11/18 |
Scope of work |
Scope of work includes.
Piping and structural fabrication works such as welding of piping joints (BW), piping joints (SW), and structural steel (SW); hydrotest / pneumatic test, machining of components and mobilization of NDT technicians and fabrication GANG.
|
|
Specialty Chem |
Jubail |
01/11/17 |
01/11/18 |
Oil & Gas |
Scaffold Services at north Ghawar area
Sector |
Oil & Gas |
Project Title |
Scaffold Services at north Ghawar area |
Project Owner |
Saudi Aramco |
Client |
North Ghawar Area |
Department |
Scaffolding Services |
Location |
North Ghawar Area |
Start Date |
01/10/17 |
End Date |
01/09/20 |
Scope of work |
Scope of work includes Scaffolding Services including supplying, erecting, renting and dismantling.
|
|
North Ghawar Area |
North Ghawar Area |
01/10/17 |
01/09/20 |
Petrochemical |
MOC Services-TA-SD-2017
Sector |
Petrochemical |
Project Title |
MOC Services-TA-SD-2017 |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/03/18 |
Scope of work |
Scope of work includes.
Provision of permanent 1″ Line with automatic valve. Piping supports modification for discharde line. Fabrication and installation of purge line vent to scrubber. Replacement of impeller. Change the position of Agitator. Replace gland packing into Mechanical seal (3 Nos Pumps). Replace CS line into SS line. Hydrotest the 24″ line almost 200 m in lenght and provide 1 No Taping.
|
|
SAUDI KAYAN |
Jubail |
01/10/17 |
01/03/18 |
Metal |
Design, Supply, Installation, Testing and Commissioning of 3W T 133 MVA, 230/34.5/13.8kV Transformer Replacement at MSS1 LPF
Sector |
Metal |
Project Title |
Design, Supply, Installation, Testing and Commissioning of 3W T 133 MVA, 230/34.5/13.8kV Transformer Replacement at MSS1 LPF |
Project Owner |
SABIC |
Client |
HADEED |
Department |
TNC |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
October 2018 |
Scope of work |
Scope of work includes.
Preventive Maintenance on 115KV GIS Bay#1, compartment, SF6 Gas Replacement, Gassing, Degassing, overhauling, Internal Inspection, Painting and Cleaning.
|
|
HADEED |
Jubail |
01/10/17 |
October 2018 |
Petrochemical |
115 kV GIS Bay # 1 & # 5 Preventive Maintenance
Sector |
Petrochemical |
Project Title |
115 kV GIS Bay # 1 & # 5 Preventive Maintenance |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
Electrical Maintenance, Testing & Commissioning Services |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/12/17 |
Scope of work |
Scope of work includes.
Preventive Maintenance on 115KV GIS Bay#1, compartment, SF6 Gas Replacement, Gassing, Degassing, overhauling, Internal Inspection, Painting and Cleaning.
|
|
PetroKemya |
Jubail |
01/10/17 |
01/12/17 |
Petrochemical |
Modification of Process Condensate Stripper (AC-0141) and Related Equipments (AF-1320028)
Sector |
Petrochemical |
Project Title |
Modification of Process Condensate Stripper (AC-0141) and Related Equipments (AF-1320028) |
Project Owner |
SABIC |
Client |
PetroKemya |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/17 |
End Date |
01/10/18 |
Scope of work |
Scope of work includes.
Supply and Install of new Oily Condensate Pump. Construction of civil foundation and related E&I work. Supply and Install new filters AF-0120A and AF-0123A. Supply and Install new coalescer AV-0122A. Supply and Replace existing AC-0141 internal trays with new high-performance trays. Supply and Replace existing AC-0141 internal trays with new high-performance trays. Supply and Install new Stripped Condensate Pump AP-0141A. Pump should be per original 255mm impeller. Provide replacement 255mm impeller for pumps AP0141/S. Supply and Install new Dilution Steam Generator AE-0143C, with associated piping and valves. All associated piping, steel structure, E&I and civil foundation work.
|
|
PetroKemya |
Jubail |
01/10/17 |
01/10/18 |
Oil & Gas |
Bolt Torque & Tensioning for K-421 Feed Gas Compressor (T&I)
Sector |
Oil & Gas |
Project Title |
Bolt Torque & Tensioning for K-421 Feed Gas Compressor (T&I) |
Project Owner |
Saudi Aramco |
Client |
Uthmaniyah Gas Plant |
Department |
BT |
Location |
Uthmaniyah |
Start Date |
01/08/17 |
End Date |
01/02/18 |
Scope of work |
Hydraulic Bolt Tightening Services for K-421 Feed Gas Compressor for T&I requirement
|
|
Uthmaniyah Gas Plant |
Uthmaniyah |
01/08/17 |
01/02/18 |