Oil & Gas |
Torqueing for GT-2 T&I at Hawiyah Plant
Sector |
Oil & Gas |
Project Title |
Torqueing for GT-2 T&I at Hawiyah Plant |
Project Owner |
Saudi Aramco |
Client |
Hawiyah Gas Plant |
Department |
BT |
Location |
Hawaiyah |
Start Date |
01/02/18 |
End Date |
01/05/18 |
Scope of work |
Provision of Torqueing crews for Hydraulic services at Hawiyah Gas plant on a 12Hr shift. Hydraulic torqueing and opening shall be performed at H48 at GT#2 during T&I.
|
|
Hawiyah Gas Plant |
Hawaiyah |
01/02/18 |
01/05/18 |
Petrochemical |
Fiber Optics Troubleshooting Services (01 Year Contract)
Sector |
Petrochemical |
Project Title |
Fiber Optics Troubleshooting Services (01 Year Contract) |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
ISCS |
Location |
Jubail |
Start Date |
10/12/17 |
End Date |
01/02/18 |
Scope of work |
Maintenance, troubleshooting and site support services for Fiber Optic Cable Communication of Sabtank ESD System, DCS system, PLC systems, RTG system and Instrumentation. These services include:
1. Fiber Optic Cable Communication for GE FANUC ESD -PLC systems, Yokogawa DCS system, RTG system and Instrumentation installed for all SABIC and Non-SABIC affiliates
2. Fiber Optic Cable Communication between CCR, LCR, Berths for all SABIC and Non-SABIC affiliates.
3. Fiber Optic Cable Communication for interface and communication between GE FANUC ESD system, Yokogawa DCS. system, RTG system and Instrumentation for all SABIC and Non-SABIC affiliates.
|
|
Sabtank Jubail |
Jubail |
10/12/17 |
01/02/18 |
Oil & Gas |
Plate Vehicle Recognition System for Saudi Aramco Northern Arabia Area Unconventional Gas (UG) Surface Facilities System-B Project
Sector |
Oil & Gas |
Project Title |
Plate Vehicle Recognition System for Saudi Aramco Northern Arabia Area Unconventional Gas (UG) Surface Facilities System-B Project |
Project Owner |
SAUDI ARAMCO / TURAIF Aramco |
Client |
SNC Lavalin (Kentz) |
Department |
BAS |
Location |
Turaif |
Start Date |
03/12/17 |
End Date |
01/05/18 |
Scope of work |
The scope inlcudes EPC of PRS Color CCD Camera, Lenses for PRS Color CCD Camera, Housing for PRS Color CCD Camera, PRS Infrared (IR) Iiluminators, PRS Poles and Mounts, Loop Detector, Visual Alarm Light, PRS Audiable Alarm / Speaker, PRS Switch, PRS Controller, KVM Receiver, Hydraulic crash barrier along with controller and Modification/Expansion of existing PRS system.
|
|
SNC Lavalin (Kentz) |
Turaif |
03/12/17 |
01/05/18 |
Petrochemical |
Repairing of 30″ PNG Line at Plant III (Emergency)
Sector |
Petrochemical |
Project Title |
Repairing of 30″ PNG Line at Plant III (Emergency) |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
PSD |
Location |
Jubail |
Start Date |
13/12/17 |
End Date |
13/12/17 |
Scope of work |
The project scope was to carry out the emergency work repair of 30” PNG Line at Ar-Razi Plant III. The pipe material is SS 321 and thickness 21 mm. It includes grinding of 4 Nos. pipe joints up to root and re-welding, rectification for 1 no. pipe support along with complete radiography test (RT).
|
|
Ar-Razi |
Jubail |
13/12/17 |
13/12/17 |
Petrochemical |
Restore the (RG) Vent Line Movement from Support in Plant II ESD (Emergency)
Sector |
Petrochemical |
Project Title |
Restore the (RG) Vent Line Movement from Support in Plant II ESD (Emergency) |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
PSD |
Location |
Jubail |
Start Date |
14/12/17 |
End Date |
14/12/17 |
Scope of work |
The project scope is to carry out the emergency work for RG Vent Line Rectification works in Plant-II ESD. It includes rectification of 24” line by cutting at joints and rectification of pipe support and damaged structure along with provision of all necessary material to complete the job.
|
|
Ar-Razi |
Jubail |
14/12/17 |
14/12/17 |
Oil & Gas |
Bolt Torque for Khuff Gas Shut Down
Sector |
Oil & Gas |
Project Title |
Bolt Torque for Khuff Gas Shut Down |
Project Owner |
Saudi Aramco |
Client |
Uthmaniyah Gas Plant |
Department |
BT |
Location |
Uthmaniyah |
Start Date |
10/01/18 |
End Date |
01/01/18 |
Scope of work |
Provision of Hydraulic bolt tightening (torque machine) to loosen and tighten the bolts at Inlet Area during shut down.
|
|
Uthmaniyah Gas Plant |
Uthmaniyah |
10/01/18 |
01/01/18 |
Oil & Gas |
Bolt Tensioning & Torquing Services (for the period of 10 years + 2 years extension option)
Sector |
Oil & Gas |
Project Title |
Bolt Tensioning & Torquing Services (for the period of 10 years + 2 years extension option) |
Project Owner |
Petro Rabigh |
Client |
Petro Rabigh |
Department |
BT |
Location |
Yanbu |
Start Date |
01/12/17 |
End Date |
01/12/27 |
Scope of work |
The scope includes bolt tensioning, bolt torqueing, un-bolting (loosening of bolts), on-site machining, flange facing, flange spreading, pipe cutting, end prepping, on-line valve testing requirements.
|
|
Petro Rabigh |
Yanbu |
01/12/17 |
01/12/27 |
Petrochemical |
Rental of Blast Resistant Modules (BRMs) for SCP/JCP TA 2018
Sector |
Petrochemical |
Project Title |
Rental of Blast Resistant Modules (BRMs) for SCP/JCP TA 2018 |
Project Owner |
Saudi Chevron |
Client |
Saudi Chevron |
Department |
RGSS |
Location |
Jubail |
Start Date |
06/11/17 |
End Date |
01/02/18 |
Scope of work |
It includes provision of 17 no’s of Blast Resistant Modules (BRMs), supply and instalation of Power Generators, Furniture for 04 workstations, elcetrical, HVAC and all Distribution Panels for combines BRMs.
|
|
Saudi Chevron |
Jubail |
06/11/17 |
01/02/18 |