Metal |
Replacement of Steam Pipes CCM PPL T/A
Sector |
Metal |
Project Title |
Replacement of Steam Pipes CCM PPL T/A |
Project Owner |
SABIC |
Client |
HADEED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/01/16 |
End Date |
01/02/16 |
Scope of work |
REPLACEMENT OF STEAM PIPES – DURING HADEED CMC TURANROUND
|
|
HADEED |
Jubail |
01/01/16 |
01/02/16 |
Petrochemical |
Implementation of EG 1&2 and LAO MOCS
Sector |
Petrochemical |
Project Title |
Implementation of EG 1&2 and LAO MOCS |
Project Owner |
SABIC |
Client |
UNITED |
Department |
PSD |
Location |
Jubail |
Start Date |
01/01/16 |
End Date |
01/03/17 |
Scope of work |
Fabrication of spools,Hydrotesting of lines, disconnection and removal of instruments,modification of steel structure,installation of control valves and new lines, loopchecking, installation of new reboilers,installation of steam tracing, scaffolding and insulation
|
|
UNITED |
Jubail |
01/01/16 |
01/03/17 |
Petrochemical |
Install standby one Re-Boiler For LP De-Ethaniser Column
Sector |
Petrochemical |
Project Title |
Install standby one Re-Boiler For LP De-Ethaniser Column |
Project Owner |
SABIC / SHARQ |
Client |
HKL Sadiq |
Department |
PSD |
Location |
Jubail |
Start Date |
01/01/16 |
End Date |
01/05/16 |
Scope of work |
•.Piping, Fabrication and site installation of one Re-Boiler For LP De-Ethaniser Column
•Supply of equipment required for the fabrication and installation
|
|
HKL Sadiq |
Jubail |
01/01/16 |
01/05/16 |
Petrochemical |
Pressure Transmitter Insatallation PE 3&4 TAM
Sector |
Petrochemical |
Project Title |
Pressure Transmitter Insatallation PE 3&4 TAM |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/12/15 |
End Date |
01/04/16 |
Scope of work |
This project involves Pressure Transmitter Insatallation in plant PE 3&4 during the annual S/D.
|
|
SHARQ |
Jubail |
01/12/15 |
01/04/16 |
Petrochemical |
Fabrication of Pipe Cold Support
Sector |
Petrochemical |
Project Title |
Fabrication of Pipe Cold Support |
Project Owner |
SADARA |
Client |
DAELIM |
Department |
CSD |
Location |
Jubail |
Start Date |
01/11/15 |
End Date |
01/12/15 |
Scope of work |
Fabrication of Pipe Cold Support
|
|
DAELIM |
Jubail |
01/11/15 |
01/12/15 |
Petrochemical |
Civil / Structural work
Sector |
Petrochemical |
Project Title |
Civil / Structural work |
Project Owner |
SABIC / IBN ZAHR |
Client |
Olayan Descon |
Department |
Civil |
Location |
Jubail |
Start Date |
15/02/16 |
End Date |
15/04/16 |
Scope of work |
This project involves Civil / Structural work at SABIC affilizate Ibn Zahr
|
|
Olayan Descon |
Jubail |
15/02/16 |
15/04/16 |
Petrochemical |
Waste Higher Alcohol (WHA) Construction Project
Sector |
Petrochemical |
Project Title |
Waste Higher Alcohol (WHA) Construction Project |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
PSD |
Location |
Jubail |
Start Date |
01/11/15 |
End Date |
01/06/17 |
Scope of work |
The project involves procurement, fabrication, modification, construction, testing and commissioning of methanol recovery Waste Higher Alcohol (WHA) side cut unit for plant II. WHA system comprisses of pumps, piping, storage thanks, electrical works, column and exchangers, instrumentation and control system/DCS integration with existing system by adding new hardware and software, civil, firefighting, etc.
|
|
Ar-Razi |
Jubail |
01/11/15 |
01/06/17 |
Mining & Minerals |
Sump Pump – Pipeline Construction Works
Sector |
Mining & Minerals |
Project Title |
Sump Pump – Pipeline Construction Works |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
PSD |
Location |
Jubail |
Start Date |
31/12/15 |
End Date |
01/06/16 |
Scope of work |
The job includes
Pipe line Construction work for Sump Pump Discharge, Fabrication, Erection, Welding, Cutting of pipe, Flange Handling, NDT, Scaffolding above 8 meters.
|
|
Ma'aden Aluminium |
Jubail |
31/12/15 |
01/06/16 |