RIK for Tube Bundle – Ethane Recycle Emergency Heater 11E114 at Ethylene Plant

The project scope is Procurement of materials, fabrication, testing and supply for Tube Bundle – Ethane Recycle Emergency heater (11-E-114) with all materials, consumables, tools like-to-like as per provided drawings and datasheet by SADAF

Read More

General Construction Services Contract (LFC)

The project scope is to execute the General services contract for MAADEN Aluminium for 3 years. The major works included in this contract are as under, procurement, Fabrication, installation, precommissioning, commissioning etc. for various discipline, Civil & Structure Works, Piping Works & Equipment Works, Electrical works & Instrumentation & control...

Read More

Piping, DCRs and Valves Package for Olefins TAM’2020

The SOW includes removal of existing pipe lines, fabrication of pipe line as per IFC, Installation of pipe line, SAFE RAD of joints, sand blasting & painting, NDT of workshop joints, removal & cutting of the valves, installation of valves, scaffolding erection/removal along with materials, insulation removal and re-installation, cold...

Read More

MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker

The Project Scope is to carry out Complete Electrical works for upgrading the electrical power system at West Pier. The details scope of work includes, Evaluate and calculate the load requirements including existing equipment and all new equipment of 2.4KV Field Switches with 13.8 Kv and Procure of 2 Existing...

Read More

Repair Monel Chutes & Centrifuge during EDC TA’19

The scope of work includes, Sand blasting for chutes to remove any Belzona and other contaminations and Bottom casing flange to remove any Belzona and other contaminations. Perform Neutralization (to remove Caustic) for all weld joints & surface cracks for chutes & centrifuge bottom casing flange. Perform weld seam repairs...

Read More

Major Piping Fabrication & Replacement EDC T/A-2019

The SOW includes Replacement of Piping during EDC T/A scheduled on June-2019. Piping replacement is on 32C8-Cl2 relief header, 32C508 relief header, 32C502 to 32K501 and 32K501 to 32V597 through 32E506/505, Emergency neutralization header, WET KAPA from 32V33/32V121 to 36IN2. Moreover, it includes cold cutting, removal of old pipe, connected...

Read More

Procurement & Construction of 40% product acid transfer line size enhancement from 4″ to 6″ in PAP Train B & A

The project scope includes to piping & valves replacement and demolishing of existing pipe line & valves, fabrication of new pipe line as per IFC, Installation of new pipe line, installation of valves, NDT & painting, Installation of Flow Transmitter & Cabling work at MA’ADEN Plant, NDT, Painting, sand basting,...

Read More

Torqueing and Tensioning Subcontract for Sadara Project

The scope of work of includes supply of certified technician and suitable equipment to carryout bolt torqueing & Tensioning jobs at SADARA plant.

Read More

Our Presence

Our offices and branches throughout the region

Headquarters

P.O. Box 11049 Tareeq 114 Jubail Industrial City 31961 Kingdom of Saudi Arabia Tel: +966-13-341-2343 Fax: +966-13-341-1288 e-mail: sendan@sendan.com.sa

Affiliates and group companies

Saudi Arabia

  • SENDAN International Company Limited, Yanbu
  • SENSORTECH Saudi Manufacturing Company,
    Al-Khobar
  • MAWAD SENDAN Trading,
    Al-Khobar
  • Basees SENDAN Security Technology, Dammam

United Arab Emirates

  • SENDAN International FZCO, Dubai.

Qatar 

  • First SENDAN Contracting & Trading Co. WLL, Doha

Korea

  • SENDAN Korea Limited, Seoul.

India

  • SENDAN International Telecom Private Limited, Mumbai
  • Crebri Technologies Private Limited, Noida