Project: Major Piping Fabrication & Replacement EDC T/A-2019
Client: SADAF
Completion Year: 2019
Prime Contractor:
Scope of Work: The SOW includes Replacement of Piping during EDC T/A scheduled on June-2019. Piping replacement is on 32C8-Cl2 relief header, 32C508 relief header, 32C502 to 32K501 and 32K501 to 32V597 through 32E506/505, Emergency neutralization header, WET KAPA from 32V33/32V121 to 36IN2. Moreover, it includes cold cutting, removal of old pipe, connected valves and reinstallation after the new pipe laying.
Location: Jubail
The SOW includes Replacement of Piping during EDC T/A scheduled on June-2019. Piping replacement is on 32C8-Cl2 relief header, 32C508 relief header, 32C502 to 32K501 and 32K501 to 32V597 through 32E506/505, Emergency neutralization header, WET KAPA from 32V33/32V121 to 36IN2. Moreover, it includes cold cutting, removal of old pipe, connected valves and reinstallation after the new pipe laying.