CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
05-23-2020 | Posted inCIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
Read MoreEXECUTION OF MULTIPLE MOCs
05-23-2020 | Posted inThe scope includes installation of new piping spools, valves and pressure transmitter, internal coating of coolant drums, electrical and instrumentation works. . To supply of material to be used for site execution and commissioning activities. To perform Hydro testing , Flushing, Draining & Pre-commissioning activities.
Read MoreSFC-for Bolt Torqueing activities at 474 Tr 200
05-23-2020 | Posted inBolt Torquing & Tensioning Services at BGP during the T&I
Read MoreDesign of Temporary Support Project
05-23-2020 | Posted inThe Scope Includes, To design the temporary supports to with stand the load of pipes (live load), To remove the existing civil support &To fabricate, supply & Install the temporary support at the location.
Read MoreElectrical PM works for Power Transformer of desalter V171 during 2017 CFS @ RRD
05-23-2020 | Posted inThe brief scope of work is as below: To provide all supervision, manpower, equipment, tools and test instrument. To Perform initial inspection of the electrical connection system especially related to the condition of the transformers and bushing connections. To Replace insulation oil of the power transformers, To Dismantle electric insulators...
Read MoreSeed Filtrate Project at MAC
05-23-2020 | Posted inThe job includes Material Procurement, Piping Fabrication & Erection(including Pipe supports), Structural Works, Site NDT(RT & MPI), PWHT, Testing & Commissioning. Flanged Connections, Cutting , Welding, Grating & beam Connection.
Read MorePort Electricity Project
05-23-2020 | Posted inThe job includes: LV Cable Glanding & termination at Aminat and SAMAPCO substation, Supply & Installation of Cable Gland/Lugs/Cable Tags, ferrules. Continuity/megger test.,To perform all the work as per International Standards.
Read MoreINSTALLATION OF SECURITY LIGHTING POST FOR DAELIM KEMYA
05-23-2020 | Posted inThe Scope of Work includes Mobilization of necessary manpower, equipment, tools & consurnables. Installation of 40 Sets Security Fencing Lighting Post, Cable Pulling with Termination, & Steel Support Fabrication
Read More