Project: Design of Temporary Support Project
Client: YANPET
Completion Year: 2016
Prime Contractor:
Scope of Work: The Scope Includes, To design the temporary supports to with stand the load of pipes (live load), To remove the existing civil support &To fabricate, supply & Install the temporary support at the location.
Location: Yanbu
The Scope Includes,
To design the temporary supports to with stand the load of pipes (live load), To remove the existing civil support &To fabricate, supply & Install the temporary support at the location.