Petrochemical |
EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122
Sector |
Petrochemical |
Project Title |
EPC LSTK for Power System Protection Upgrade in IBB (IBB Relay Project) SP-173100122 |
Project Owner |
SABIC |
Client |
Ibn Al-Baytar |
Department |
TNC |
Location |
Jubail |
Start Date |
June 2019 |
End Date |
July 2020 |
Scope of work |
The scope of work includes Engineering, Procurement & construction. The details scope of work includes supply, installation, Testing and Commissioning of Transformer differential Relay for T/F differential Protection, Feeder Protection O/C Relay for Feeder Protection, Motor Feeder Protection Relays for Feeder Protection, Earth leakage Relays, LV MCCBs, new Switchgear and associated Bus duct in substation.
|
|
Ibn Al-Baytar |
Jubail |
June 2019 |
July 2020 |
Petrochemical |
Torqueing and Tensioning Subcontract for Sadara Project
Sector |
Petrochemical |
Project Title |
Torqueing and Tensioning Subcontract for Sadara Project |
Project Owner |
SADARA |
Client |
KBR Al Yusr Ltd |
Department |
BT |
Location |
Jubail |
Start Date |
May 2019 |
End Date |
May 2022 |
Scope of work |
The scope of work of includes supply of certified technician and suitable equipment to carryout bolt torqueing & Tensioning jobs at SADARA plant.
|
|
KBR Al Yusr Ltd |
Jubail |
May 2019 |
May 2022 |
Petrochemical |
Piping Recommendation 3” BFW Line // Ar-Razi Emergency Requirement
Sector |
Petrochemical |
Project Title |
Piping Recommendation 3” BFW Line // Ar-Razi Emergency Requirement |
Project Owner |
SABIC |
Client |
Ar-Razi |
Department |
PSD |
Location |
Jubail |
Start Date |
May 2019 |
End Date |
September 2019 |
Scope of work |
The project scope is to carry out the replacement work for the 3” BFW line in AR-RAZI. The replacement works involve 24-meter pipe, 11 elbows and 2 pipe supports.
|
|
Ar-Razi |
Jubail |
May 2019 |
September 2019 |
Petrochemical |
Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years)
Sector |
Petrochemical |
Project Title |
Scaffolding Services (Pro-Forma Contract) in Sadara (LFC 4 Years) |
Project Owner |
SADARA |
Client |
SADARA |
Department |
SCF |
Location |
SGPD |
Start Date |
May 2019 |
End Date |
May 2023 |
Scope of work |
The scope of work is to provide necessary personnel, scaffolding materials, supervision and transportation for the provision of scaffolding services in all SADARA plants. The details work includes rigging, erection and dismantling of tower built scaffolding, independent tied scaffolding, suspended scaffolding, mobile tower scaffolding, Vessel/Column/tank exterior scaffolding and vessel/column/tank interior scaffolding and the provision of scaffolding maintenance services including site cleanup.
|
|
SADARA |
SGPD |
May 2019 |
May 2023 |
Oil & Gas |
To Provide Scaffolding Services for SGPD’s Facilities
Sector |
Oil & Gas |
Project Title |
To Provide Scaffolding Services for SGPD’s Facilities |
Project Owner |
Saudi Aramco |
Client |
SGPD |
Department |
SCF |
Location |
SGPD |
Start Date |
May 2019 |
End Date |
May 2021 |
Scope of work |
The scope of work is to provide scaffolding services at SGPD’s plants and other locations such as off-plot pipelines, valves & welheads.
|
|
SGPD |
SGPD |
May 2019 |
May 2021 |
Petrochemical |
EPC LSTK for Replacement of DEG/TEG/MEG and Service Water Pipelines at Tank Farm and Loading Bay in Sabtank Jubail
Sector |
Petrochemical |
Project Title |
EPC LSTK for Replacement of DEG/TEG/MEG and Service Water Pipelines at Tank Farm and Loading Bay in Sabtank Jubail |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
April 2019 |
End Date |
April 2020 |
Scope of work |
The SOW includes designing, engineering, procurement, installation and testing and comissioning of various works such as: The Major SOW for TEG piping lines includes demolition & replacement only. Scope for DEG piping lines includes demolition & replacement also. MEG piping lines also includes demolition & replacement scope. It also includes MEG Service Water Lines demolition, replacement and painting activities. Other activates includes manual excavation, associated civil works, dewatering, concrete duck bank, concrete thrust block etc. Electrical works includes supply of power system to the new cathodic protection (CP) system for the major lines and service water lines. Instrumentation works includes dismantling and re-use of existing instruments, calibration as well as DCS and ESD support.
|
|
Sabtank Jubail |
Jubail |
April 2019 |
April 2020 |
Oil & Gas |
Scaffolding Dismantling JIGCC Utilities, Common Area Package 5 project
Sector |
Oil & Gas |
Project Title |
Scaffolding Dismantling JIGCC Utilities, Common Area Package 5 project |
Project Owner |
Saudi Aramco |
Client |
Sinopec SEG |
Department |
SCF |
Location |
Jazan |
Start Date |
March 2019 |
End Date |
April 2019 |
Scope of work |
Scope of work include, Dismantling of Scaffolding at Jazan Refinery.
|
|
Sinopec SEG |
Jazan |
March 2019 |
April 2019 |
Petrochemical |
Rental Services for BRM Offices, Ablution Units during PP2 SD’2019
Sector |
Petrochemical |
Project Title |
Rental Services for BRM Offices, Ablution Units during PP2 SD’2019 |
Project Owner |
SABIC |
Client |
IBN-ZAHR |
Department |
RGSS |
Location |
Jubail |
Start Date |
March 2019 |
End Date |
April 2019 |
Scope of work |
The project scope includes Supply of blast proof cabins (02 Nos.) and ablution block (01 No.) on rental basis for PP2 shutdown in Ibn Zahr. Supply of power Generator (50 KVA) along with cable connections for each BRM’s.
|
|
IBN-ZAHR |
Jubail |
March 2019 |
April 2019 |