Petrochemical |
Removal- Re-Installation of Valves, PSVs, CVs, Sea Water Valves, Sea Water Headers and MISC job
Sector |
Petrochemical |
Project Title |
Removal- Re-Installation of Valves, PSVs, CVs, Sea Water Valves, Sea Water Headers and MISC job |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
PSD |
Location |
Jubail |
Start Date |
February 2019 |
End Date |
April 2019 |
Scope of work |
The SOW includes Blinding & De-blinding of the Equipment’s, Opening & Box up of the Equipment’s, and Torque Tightening of all related flanges which will be opened during TA. The equipment include:
• SW Headers (Supply & Return)
• SW valves (59 no.)
• Block valves / Critical Valves (169 no.)
• PSV’s (82 no.) & Control Valves (111 no.)
• Misc. Equipments: Ejector (2 no.), De-Super heater (2 no.), Static Mixer (3 no.), Stack (1 no.), FD Fan (1 no.)
• Corroded Piping & Elbow Replacement (2 no.)
|
|
IBN-SINA |
Jubail |
February 2019 |
April 2019 |
Petrochemical |
Long Term Agreement for All types of Machinery & Fabrication Services to Sahara affiliates (3 Years)
Sector |
Petrochemical |
Project Title |
Long Term Agreement for All types of Machinery & Fabrication Services to Sahara affiliates (3 Years) |
Project Owner |
SAHARA |
Client |
SAHARA |
Department |
TSD |
Location |
Jubail |
Start Date |
January 2019 |
End Date |
January 2022 |
Scope of work |
The project scope is to carry out LTA for all types of Machinery and Fabrication services to Sahara Affiliates for a period of three years. It includes Machining Repair, Fabrication Repair and all inspection findings during break down.
|
|
SAHARA |
Jubail |
January 2019 |
January 2022 |
Petrochemical |
Scaffolding works at FARABI, Yanbu
Sector |
Petrochemical |
Project Title |
Scaffolding works at FARABI, Yanbu |
Project Owner |
Farabi Petrochemicals |
Client |
NCC |
Department |
SCF |
Location |
Yanbu |
Start Date |
January 2019 |
End Date |
March 2019 |
Scope of work |
The scope of work includes supervision, manpower, equipment, transportation, Erection and dismantling of scaffolding.
|
|
NCC |
Yanbu |
January 2019 |
March 2019 |
Petrochemical |
Fabrication of two screw shafts
Sector |
Petrochemical |
Project Title |
Fabrication of two screw shafts |
Project Owner |
Tasnee |
Client |
Tasnee |
Department |
TSD |
Location |
Jubail |
Start Date |
January 2019 |
End Date |
February 2019 |
Scope of work |
The scope of work includes fabrication of two secrew shafts.
|
|
Tasnee |
Jubail |
January 2019 |
February 2019 |
Oil & Gas |
MFC for T&I 2019 Flange Bolt Torquing
Sector |
Oil & Gas |
Project Title |
MFC for T&I 2019 Flange Bolt Torquing |
Project Owner |
Saudi Aramco |
Client |
Berri Gas Plant |
Department |
BT |
Location |
Jubail |
Start Date |
January 2019 |
End Date |
December 2019 |
Scope of work |
The scope of work includes Flanges Bolt Torquing Services for T&I activites at Berri Gas Plant
|
|
Berri Gas Plant |
Jubail |
January 2019 |
December 2019 |
Mining & Minerals |
Supply of Fabrication & Supply of Condenser Coils
Sector |
Mining & Minerals |
Project Title |
Supply of Fabrication & Supply of Condenser Coils |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
TSD |
Location |
Ras Al-Khair |
Start Date |
December 2018 |
End Date |
February 2019 |
Scope of work |
Supply of Fabrication & Supply of Condenser Coils
|
|
Ma'aden Phosphate |
Ras Al-Khair |
December 2018 |
February 2019 |
Petrochemical |
LSTK services for Mixed Gas Project
Sector |
Petrochemical |
Project Title |
LSTK services for Mixed Gas Project |
Project Owner |
SABIC |
Client |
SADAF |
Department |
PSD |
Location |
Jubail |
Start Date |
December 2018 |
End Date |
August 2019 |
Scope of work |
The project scope of work includes Engineering, supply, Construction and Commissioning for Mixed Gas Project.
Design and Detailed Engineering. Procurement of material (piping, valves, civil and E&I). Piping fabrication and erection (including demolition and tie-in scope). Scaffolding erection and dismantling. Fabrication and erection of pipe supports (including civil foundations). Modification works for Vessel (43V3). Dismantling and reinstallation of Pressure transmitter. Supply and installation of new DP type flow transmitter with flow element. Supply and installation of secondary cable from new FT to existing JB (43XTB10 having spare terminals). Supply and installation of GI conduit and SS air tubing for newly install FT. Loop checking. DCS configuration.
|
|
SADAF |
Jubail |
December 2018 |
August 2019 |
Oil & Gas |
Scaffolding Services for Yanbu Terminal (Long-Form Contract)
Sector |
Oil & Gas |
Project Title |
Scaffolding Services for Yanbu Terminal (Long-Form Contract) |
Project Owner |
Saudi Aramco |
Client |
YANBU TERMINAL |
Department |
SCF |
Location |
Yanbu |
Start Date |
November 2018 |
End Date |
Novmeber 2023 |
Scope of work |
The scope of work includes supervision, manpower, equipment, transportation, offices, catering and accommodation, materials. The services required to transport, erect, disassemble scaffolding and the onshore and offshore facilities at Western Region Terminal Department facilities at Yanbu North Terminal, Yanbu South Terminal, Rabigh Area and Jeddah Terminal.
|
|
YANBU TERMINAL |
Yanbu |
November 2018 |
Novmeber 2023 |