Petrochemical |
Repair & Replacement Of Reactor Pipe Spool Of 24″, 30″ 42″(Repair for Hydro-Carbon Cactus Branch Flanges Joint / Repair of Air Register / Repaire of MN 106) During S/D
Sector |
Petrochemical |
Project Title |
Repair & Replacement Of Reactor Pipe Spool Of 24″, 30″ 42″(Repair for Hydro-Carbon Cactus Branch Flanges Joint / Repair of Air Register / Repaire of MN 106) During S/D |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/13 |
End Date |
01/04/13 |
Scope of work |
Inspection Of 24″ Line and Repair (Mechanical Works)
|
|
IBN-SINA |
Jubail |
01/03/13 |
01/04/13 |
Petrochemical |
Benzene Storage Enhancement
Sector |
Petrochemical |
Project Title |
Benzene Storage Enhancement |
Project Owner |
SABIC |
Client |
SADAF |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/13 |
End Date |
01/12/16 |
Scope of work |
Engineering, Procurement & Supply Of Material, Fabrication & Installation (EPC) Of Piping & Equipment.
• At two locations (SADAF & SABTANK) Replace the tank bottom in kind with a new one at
• Install a leak detection system liner
• Install new cathodic protection system.
• Contaminated sand beneath tank
• Replace the contaminated oily sand by sweet sand
• Replace asbestos gaskets
• Replace elastomeric seal materials
• Civil and E&I works
|
|
SADAF |
Jubail |
01/03/13 |
01/12/16 |
Petrochemical |
Fabrication of 1 no new HC – inlet Spool During Shut Down.
Sector |
Petrochemical |
Project Title |
Fabrication of 1 no new HC – inlet Spool During Shut Down. |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/13 |
End Date |
01/05/13 |
Scope of work |
Removal/Installation of Fabricated Spool & Valve Along With Repairing Of Old Spool,
|
|
IBN-SINA |
Jubail |
01/03/13 |
01/05/13 |
Petrochemical |
Structural Support works – Weld repairs & Inspection
Sector |
Petrochemical |
Project Title |
Structural Support works – Weld repairs & Inspection |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/13 |
End Date |
01/03/13 |
Scope of work |
Structural modification, replacement and re-installation
|
|
IBN-SINA |
Jubail |
01/03/13 |
01/03/13 |
Petrochemical |
Fabrication of Spade Blind for TAM 2013
Sector |
Petrochemical |
Project Title |
Fabrication of Spade Blind for TAM 2013 |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/02/13 |
End Date |
01/06/13 |
Scope of work |
Fabrication of spade blind for tAM 2013
|
|
TASNEE |
Jubail |
01/02/13 |
01/06/13 |
Petrochemical |
New Blind List for fabrication TAM2013
Sector |
Petrochemical |
Project Title |
New Blind List for fabrication TAM2013 |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/02/13 |
End Date |
01/04/13 |
Scope of work |
Fabrication & Installation (Mechanical Works)
|
|
TASNEE |
Jubail |
01/02/13 |
01/04/13 |
Transportation & Infrastructure |
Supply of Manpower and Equipment
Sector |
Transportation & Infrastructure |
Project Title |
Supply of Manpower and Equipment |
Project Owner |
SAMSUNG |
Client |
SAMSUNG |
Department |
PSD |
Location |
Jubail |
Start Date |
01/01/13 |
End Date |
01/03/13 |
Scope of work |
Mechanical Works (Man power supply)
|
|
SAMSUNG |
Jubail |
01/01/13 |
01/03/13 |
Petrochemical |
PP-2 Auto Advancing System Project
Sector |
Petrochemical |
Project Title |
PP-2 Auto Advancing System Project |
Project Owner |
SABIC |
Client |
IBN-ZAHR |
Department |
PSD |
Location |
Jubail |
Start Date |
01/12/12 |
End Date |
01/03/13 |
Scope of work |
The project scope includes Mechanical Works, ECI & Cilvil Works for the PP-2 Auto Advancing System Project.
|
|
IBN-ZAHR |
Jubail |
01/12/12 |
01/03/13 |