Petrochemical |
MP Steam Line for RA Duct
Sector |
Petrochemical |
Project Title |
MP Steam Line for RA Duct |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/12 |
End Date |
01/11/12 |
Scope of work |
Mechanical Works (Man power supply)
|
|
TASNEE |
Jubail |
01/10/12 |
01/11/12 |
Petrochemical |
Design Fabrication & Installation of Ammonia Line between IBB & Al bayroni
Sector |
Petrochemical |
Project Title |
Design Fabrication & Installation of Ammonia Line between IBB & Al bayroni |
Project Owner |
SABIC |
Client |
AL-BAYRONI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/12 |
End Date |
01/03/13 |
Scope of work |
Design, Supply, Fabrication, Construction along With Commisioning, (Mechanical, Civil, E & I Works)
|
|
AL-BAYRONI |
Jubail |
01/08/12 |
01/03/13 |
Oil & Gas |
Construction Of Amine Surge Tank & Replacement During S/D.
Sector |
Oil & Gas |
Project Title |
Construction Of Amine Surge Tank & Replacement During S/D. |
Project Owner |
SAMREF |
Client |
SAMREF |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/09/12 |
End Date |
01/07/13 |
Scope of work |
Design, Procurement,
Fabrication & Construction Works
|
|
SAMREF |
Yanbu |
01/09/12 |
01/07/13 |
Oil & Gas |
Repair of Caustic Tank During ShutDown
Sector |
Oil & Gas |
Project Title |
Repair of Caustic Tank During ShutDown |
Project Owner |
SAMREF |
Client |
SAMREF |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/09/12 |
End Date |
01/07/13 |
Scope of work |
Procurement,
Fabrication & Construction Works
|
|
SAMREF |
Yanbu |
01/09/12 |
01/07/13 |
Petrochemical |
Engineering Fabrication and Installation of Handhole & N2 Purging Nozzles
Sector |
Petrochemical |
Project Title |
Engineering Fabrication and Installation of Handhole & N2 Purging Nozzles |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/13 |
End Date |
01/07/13 |
Scope of work |
Engineering, Construction. (Mechanical Works)
|
|
TASNEE |
Jubail |
01/07/13 |
01/07/13 |
Petrochemical |
Installation of Fire Fighting System at Tasnee
Sector |
Petrochemical |
Project Title |
Installation of Fire Fighting System at Tasnee |
Project Owner |
TASNEE |
Client |
SAMSUNG |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/12 |
End Date |
01/02/13 |
Scope of work |
Supply, Contruction work Like Piping/ Repair welding 7 Painting & NDT, (Mechanical Works)
|
|
SAMSUNG |
Jubail |
01/07/12 |
01/02/13 |
Petrochemical |
Ship Loading arm base plate modification and other misc. structure modification
Sector |
Petrochemical |
Project Title |
Ship Loading arm base plate modification and other misc. structure modification |
Project Owner |
TASNEE |
Client |
SAMSUNG |
Department |
PSD |
Location |
Jubail |
Start Date |
01/10/12 |
End Date |
01/07/13 |
Scope of work |
Modification Of Plateform At Berth, Base Plate Modification Of Loading Arm At Two Different Berths. (Mechanical Works)
|
|
SAMSUNG |
Jubail |
01/10/12 |
01/07/13 |
Petrochemical |
Emergency Shut Down/Spool Repair and other maintenance Work
Sector |
Petrochemical |
Project Title |
Emergency Shut Down/Spool Repair and other maintenance Work |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/12 |
End Date |
01/06/12 |
Scope of work |
Mechanical Works
|
|
IBN-SINA |
Jubail |
01/05/12 |
01/06/12 |