Petrochemical |
Replacement of 14 inch piping in RC Corridor
Sector |
Petrochemical |
Project Title |
Replacement of 14 inch piping in RC Corridor |
Project Owner |
SABIC |
Client |
SADAF |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/13 |
End Date |
01/06/13 |
Scope of work |
Dismentalling & Re-Insatllation Of Piping along with NDT, Scaffolding & Coating Works
|
|
SADAF |
Jubail |
01/05/13 |
01/06/13 |
Petrochemical |
Replacement Of Jacketed Vent Line During S/D
Sector |
Petrochemical |
Project Title |
Replacement Of Jacketed Vent Line During S/D |
Project Owner |
CHEMANOL |
Client |
CHEMANOL |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/13 |
End Date |
01/06/13 |
Scope of work |
Piping replacement and modification
|
|
CHEMANOL |
Jubail |
01/04/13 |
01/06/13 |
Petrochemical |
Modification Of Kayan Conveying system
Sector |
Petrochemical |
Project Title |
Modification Of Kayan Conveying system |
Project Owner |
SABIC / SAUDI KAYAN |
Client |
COPERION |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/13 |
End Date |
01/02/14 |
Scope of work |
Supply & Installation of Electrical /Intrumentation Equipments
|
|
COPERION |
Jubail |
01/04/13 |
01/02/14 |
Petrochemical |
Piping Job At K.F Port for RTU flow meter
Sector |
Petrochemical |
Project Title |
Piping Job At K.F Port for RTU flow meter |
Project Owner |
SABIC / SABTANK |
Client |
YOKOGAWA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/13 |
End Date |
01/05/13 |
Scope of work |
Piping replacement & modification
|
|
YOKOGAWA |
Jubail |
01/04/13 |
01/05/13 |
Petrochemical |
Installation of Drain Line for LV-22201B (Piping Job)
Sector |
Petrochemical |
Project Title |
Installation of Drain Line for LV-22201B (Piping Job) |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/13 |
End Date |
01/06/13 |
Scope of work |
Fabrication & Installation (Mechanical Works) (Aliminium Job)
|
|
TASNEE |
Jubail |
01/04/13 |
01/06/13 |
Petrochemical |
Heat Exchanger Replacement Job During Shut Down (HP Cooler 6E-1501)
Sector |
Petrochemical |
Project Title |
Heat Exchanger Replacement Job During Shut Down (HP Cooler 6E-1501) |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/13 |
End Date |
01/05/13 |
Scope of work |
Inspection & Repairing (Mechanical Works)
|
|
TASNEE |
Jubail |
01/04/13 |
01/05/13 |
Petrochemical |
Refurbishment Of Heater, Ducts & Stack
Sector |
Petrochemical |
Project Title |
Refurbishment Of Heater, Ducts & Stack |
Project Owner |
SABIC |
Client |
IBN RUSHD |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/03/13 |
End Date |
01/09/13 |
Scope of work |
Revamping Of Heater, Re-Installation Of stack, removal & Re-Installation Of Heater Ducts & Re-tubing Of Heater
• Installation of new fabricated stack elevation up to 80 meters
• Dismantling of Heater A.
• Dismantle / Install radiant and convection tubes
• Dismantle / Repair / Install stack connecting ducts
• Removal of damaged stack portion at elevation 40 meters
• Repair outer heater shell
• Scaffolding erection for removal of damaged stack
• Installation of free issued expansion joints.
• All electrical and instrumentation removal and re-installation
• Rolling of free issued plates for heater casing.
|
|
IBN RUSHD |
Yanbu |
01/03/13 |
01/09/13 |
Petrochemical |
Replacement of PCW Heat Exchanger
Sector |
Petrochemical |
Project Title |
Replacement of PCW Heat Exchanger |
Project Owner |
TASNEE |
Client |
TASNEE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/01/13 |
End Date |
01/06/13 |
Scope of work |
(Mechanical Works) Installation Of Heat Exchanger
|
|
TASNEE |
Jubail |
01/01/13 |
01/06/13 |