| Oil & Gas |
Removal/installation of Seawater pumps
| Sector |
Oil & Gas |
| Project Title |
Removal/installation of Seawater pumps |
| Project Owner |
SABIC / Gas Jubail |
| Client |
LINDE |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/09/13 |
| End Date |
01/02/14 |
| Scope of work |
To remove the existing Sea Water Pumps & Install new Sea Water Pumps and their associate piping.
|
|
LINDE |
Jubail |
01/09/13 |
01/02/14 |
| Petrochemical |
Replacement of Glycol De-hydrator condenser 3E-1407A/B
| Sector |
Petrochemical |
| Project Title |
Replacement of Glycol De-hydrator condenser 3E-1407A/B |
| Project Owner |
SABIC |
| Client |
SHARQ |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/09/13 |
| End Date |
01/01/14 |
| Scope of work |
Replacement of Glycol De-hydrator condenser 3E-1407A/B
|
|
SHARQ |
Jubail |
01/09/13 |
01/01/14 |
| Petrochemical |
Installing additional valve in Ammonia start up line & Upgrading the existing valve with multi trim valve in IBB Urea Plant
| Sector |
Petrochemical |
| Project Title |
Installing additional valve in Ammonia start up line & Upgrading the existing valve with multi trim valve in IBB Urea Plant |
| Project Owner |
SABIC |
| Client |
IBN AL-BAYTAR |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/08/13 |
| End Date |
01/04/14 |
| Scope of work |
Modification in the existing system along with the Installation of the Valve on Ammonia Start up Line.
|
|
IBN AL-BAYTAR |
Jubail |
01/08/13 |
01/04/14 |
| Petrochemical |
Supply, fabrication & delivery of Structural Steel (Circular Platforms)
| Sector |
Petrochemical |
| Project Title |
Supply, fabrication & delivery of Structural Steel (Circular Platforms) |
| Project Owner |
SADARA |
| Client |
LINDE |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/08/13 |
| End Date |
01/11/13 |
| Scope of work |
Procurement, Construction, Fabrication of Steel Structure Circular Plate forms
|
|
LINDE |
Jubail |
01/08/13 |
01/11/13 |
| Petrochemical |
Tie In Jobs
| Sector |
Petrochemical |
| Project Title |
Tie In Jobs |
| Project Owner |
TASNEE |
| Client |
DAR |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/07/13 |
| End Date |
01/07/13 |
| Scope of work |
Piping Tie in at different points on different line sizes. (Mechanical Work)
|
|
DAR |
Jubail |
01/07/13 |
01/07/13 |
| Oil & Gas |
Luberef – Revamping Works for Heater B1001 (Erection)
| Sector |
Oil & Gas |
| Project Title |
Luberef – Revamping Works for Heater B1001 (Erection) |
| Project Owner |
LUBREF |
| Client |
KT ARABIA |
| Department |
PSD |
| Location |
Yanbu |
| Start Date |
01/06/13 |
| End Date |
01/12/13 |
| Scope of work |
Revamping work for Heater i.e Installation of pre-fabricated Steel Structure, Ducts, Installtion Of Pumps and associate Piping, civil foundation works & Intrumentaion work.
|
|
KT ARABIA |
Yanbu |
01/06/13 |
01/12/13 |
| Oil & Gas |
Supply of Steel Structure and Fabrication
| Sector |
Oil & Gas |
| Project Title |
Supply of Steel Structure and Fabrication |
| Project Owner |
LUBREF |
| Client |
KT ARABIA |
| Department |
PSD |
| Location |
Yanbu |
| Start Date |
01/06/13 |
| End Date |
01/12/13 |
| Scope of work |
Procurement & Fabrication of Steel Structure, (Mechanical Works)
|
|
KT ARABIA |
Yanbu |
01/06/13 |
01/12/13 |
| Oil & Gas |
Pin hole in H/EXS need for welding
| Sector |
Oil & Gas |
| Project Title |
Pin hole in H/EXS need for welding |
| Project Owner |
SABIC |
| Client |
Gas Jubail |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/06/13 |
| End Date |
01/07/13 |
| Scope of work |
Repair of pin hole by welding.
|
|
Gas Jubail |
Jubail |
01/06/13 |
01/07/13 |