Petrochemical |
Installing additional valve in Ammonia start up line & Upgrading the existing valve with multi trim valve in IBB Urea Plant
Sector |
Petrochemical |
Project Title |
Installing additional valve in Ammonia start up line & Upgrading the existing valve with multi trim valve in IBB Urea Plant |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/13 |
End Date |
01/04/14 |
Scope of work |
Modification in the existing system along with the Installation of the Valve on Ammonia Start up Line.
|
|
IBN AL-BAYTAR |
Jubail |
01/08/13 |
01/04/14 |
Petrochemical |
Supply, fabrication & delivery of Structural Steel (Circular Platforms)
Sector |
Petrochemical |
Project Title |
Supply, fabrication & delivery of Structural Steel (Circular Platforms) |
Project Owner |
SADARA |
Client |
LINDE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/08/13 |
End Date |
01/11/13 |
Scope of work |
Procurement, Construction, Fabrication of Steel Structure Circular Plate forms
|
|
LINDE |
Jubail |
01/08/13 |
01/11/13 |
Petrochemical |
Tie In Jobs
Sector |
Petrochemical |
Project Title |
Tie In Jobs |
Project Owner |
TASNEE |
Client |
DAR |
Department |
PSD |
Location |
Jubail |
Start Date |
01/07/13 |
End Date |
01/07/13 |
Scope of work |
Piping Tie in at different points on different line sizes. (Mechanical Work)
|
|
DAR |
Jubail |
01/07/13 |
01/07/13 |
Oil & Gas |
Luberef – Revamping Works for Heater B1001 (Erection)
Sector |
Oil & Gas |
Project Title |
Luberef – Revamping Works for Heater B1001 (Erection) |
Project Owner |
LUBREF |
Client |
KT ARABIA |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/06/13 |
End Date |
01/12/13 |
Scope of work |
Revamping work for Heater i.e Installation of pre-fabricated Steel Structure, Ducts, Installtion Of Pumps and associate Piping, civil foundation works & Intrumentaion work.
|
|
KT ARABIA |
Yanbu |
01/06/13 |
01/12/13 |
Oil & Gas |
Supply of Steel Structure and Fabrication
Sector |
Oil & Gas |
Project Title |
Supply of Steel Structure and Fabrication |
Project Owner |
LUBREF |
Client |
KT ARABIA |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/06/13 |
End Date |
01/12/13 |
Scope of work |
Procurement & Fabrication of Steel Structure, (Mechanical Works)
|
|
KT ARABIA |
Yanbu |
01/06/13 |
01/12/13 |
Oil & Gas |
Pin hole in H/EXS need for welding
Sector |
Oil & Gas |
Project Title |
Pin hole in H/EXS need for welding |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/13 |
End Date |
01/07/13 |
Scope of work |
Repair of pin hole by welding.
|
|
Gas Jubail |
Jubail |
01/06/13 |
01/07/13 |
Petrochemical |
Fabrication & Installation of 2051-UF2 Alloy Tank
Sector |
Petrochemical |
Project Title |
Fabrication & Installation of 2051-UF2 Alloy Tank |
Project Owner |
SABIC |
Client |
AL-BAYRONI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/13 |
End Date |
01/03/14 |
Scope of work |
Procurement, Fabrication & Intallation (Mechanical work) for Alloy Tanks
|
|
AL-BAYRONI |
Jubail |
01/06/13 |
01/03/14 |
Petrochemical |
Cable Splicing – HDPE insedint-May 13.
Sector |
Petrochemical |
Project Title |
Cable Splicing – HDPE insedint-May 13. |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
E&I |
Location |
Jubail |
Start Date |
01/10/13 |
End Date |
01/10/13 |
Scope of work |
Cable splicing jobs
|
|
SAUDI KAYAN |
Jubail |
01/10/13 |
01/10/13 |