| Petrochemical |
Individual Lube Oil Console for BFW pumps 1P-8004A/B/C/D)
| Sector |
Petrochemical |
| Project Title |
Individual Lube Oil Console for BFW pumps 1P-8004A/B/C/D) |
| Project Owner |
SABIC |
| Client |
SHARQ |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/11/13 |
| End Date |
01/03/14 |
| Scope of work |
LSTK, Design, Fabrication, Installation & commisioning. Involes all three Dicipline (Mechanical, Civil, E&I)
|
|
SHARQ |
Jubail |
01/11/13 |
01/03/14 |
| Petrochemical |
Replacement of Glycol Pre-Heater 2E-1401 A/B)
| Sector |
Petrochemical |
| Project Title |
Replacement of Glycol Pre-Heater 2E-1401 A/B) |
| Project Owner |
SABIC |
| Client |
SHARQ |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/11/13 |
| End Date |
01/04/14 |
| Scope of work |
Removal & Reinstallation Of Pre-Heater during TAM for the Replacement of Glycol Pre-Heater 2E-1401 A/B) Project at SHARQ EG2
|
|
SHARQ |
Jubail |
01/11/13 |
01/04/14 |
| Petrochemical |
Site Construction work
| Sector |
Petrochemical |
| Project Title |
Site Construction work |
| Project Owner |
SABIC |
| Client |
YANPET |
| Department |
PSD |
| Location |
Yanbu |
| Start Date |
01/11/13 |
| End Date |
01/02/15 |
| Scope of work |
Construction, Fabirication, Installation involving Procurment activities for 06 different Projects
|
|
YANPET |
Yanbu |
01/11/13 |
01/02/15 |
| Petrochemical |
LSTK Contract For Recovered Water Line
| Sector |
Petrochemical |
| Project Title |
LSTK Contract For Recovered Water Line |
| Project Owner |
SABIC |
| Client |
SADAF |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/10/13 |
| End Date |
01/07/14 |
| Scope of work |
Lump Sum Turnkey project (Design, Supply & Construction for Pipe line of about 8Km in RC corridors.)
• Detailed Design of the new location of pipeline in RC Corridor.
• Replace the recovery water line, 14 inch Dia
• Procured, prefabricated, supply and constructed at site.
• Cutting, dismantling and removal of the existing, 14 inch recovery water line
• Scaffolding Work
• Electrical and communication
|
|
SADAF |
Jubail |
01/10/13 |
01/07/14 |
| Metal |
Replacement of Gearbox with motor for weigh feeders in Module-C HADEED
| Sector |
Metal |
| Project Title |
Replacement of Gearbox with motor for weigh feeders in Module-C HADEED |
| Project Owner |
SABIC / HADEED |
| Client |
TAHSEEB ENGINEERING |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/10/13 |
| End Date |
01/01/14 |
| Scope of work |
Dismentling / Re-Installing & Maintenance activities for Gear Box of Wieghing Feeder Motor. (Mechanical Work)
|
|
TAHSEEB ENGINEERING |
Jubail |
01/10/13 |
01/01/14 |
| Petrochemical |
Site Construction work AF-0513139
| Sector |
Petrochemical |
| Project Title |
Site Construction work AF-0513139 |
| Project Owner |
SABIC |
| Client |
YANPET |
| Department |
PSD |
| Location |
Yanbu |
| Start Date |
01/10/13 |
| End Date |
01/02/15 |
| Scope of work |
Construction, Fabirication, Installation involving Procurment activities for 15 different Projects
|
|
YANPET |
Yanbu |
01/10/13 |
01/02/15 |
| Petrochemical |
Slop Drums Discharge Piping Eetension Project (B52)
| Sector |
Petrochemical |
| Project Title |
Slop Drums Discharge Piping Eetension Project (B52) |
| Project Owner |
SABIC |
| Client |
Sabtank Jubail |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/10/13 |
| End Date |
01/12/13 |
| Scope of work |
Removal & Installation of Existing piping with new involes Mechanical Construction, Fabrication, Procurement & Scaffolding Activities
|
|
Sabtank Jubail |
Jubail |
01/10/13 |
01/12/13 |
| Oil & Gas |
Cutting & Welding Of 6″ & 3″ Potable Water Line
| Sector |
Oil & Gas |
| Project Title |
Cutting & Welding Of 6″ & 3″ Potable Water Line |
| Project Owner |
SABIC |
| Client |
Gas Jubail |
| Department |
PSD |
| Location |
Jubail |
| Start Date |
01/10/13 |
| End Date |
01/10/13 |
| Scope of work |
Removal, Installation & welding of 6″ & 3″ portable water lines
|
|
Gas Jubail |
Jubail |
01/10/13 |
01/10/13 |