Petrochemical |
Cooling Water Pump (X-201J-A/B) & U-200J/A) Piping 3D TRACER ONLINE ANALYZERS
Sector |
Petrochemical |
Project Title |
Cooling Water Pump (X-201J-A/B) & U-200J/A) Piping 3D TRACER ONLINE ANALYZERS |
Project Owner |
SABIC |
Client |
IBN AL-BAYTAR |
Department |
PSD |
Location |
Jubail |
Start Date |
01/04/15 |
End Date |
01/08/15 |
Scope of work |
Project involves Design, Engineering & Installation of 3D Tracer along with steel structure shed, civil foundation, related PVC piping and E&I work.
|
|
IBN AL-BAYTAR |
Jubail |
01/04/15 |
01/08/15 |
Petrochemical |
Preventing air entry to Flare Header
Sector |
Petrochemical |
Project Title |
Preventing air entry to Flare Header |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/05/15 |
End Date |
01/11/15 |
Scope of work |
Project involves Design, Procurement of Material, Installation of Valves, Testing & Commissioning including Supply and Installation of Valves, Digital JB’s (EExd), DI DCS Modules along with Scaffolding activities.
|
|
SHARQ |
Jubail |
01/05/15 |
01/11/15 |
Petrochemical |
EPC PR for Shut off Valve
Sector |
Petrochemical |
Project Title |
EPC PR for Shut off Valve |
Project Owner |
SABIC |
Client |
IBN-SINA |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/09/15 |
Scope of work |
Project involves Design and Detailed Engineering, Supply of Materials, Installation, Testing and Commissioning to provide Trip Valve with Trip Logic on LP Steam Line going to DIB Re-Boilers along with Cutting, Demolition Piping, Scafolding works, Conduit Installation, Cable Laying,Glanding and Termination.
|
|
IBN-SINA |
Jubail |
01/03/15 |
01/09/15 |
Petrochemical |
Replace Oxygen Mixing Station with N2 Line
Sector |
Petrochemical |
Project Title |
Replace Oxygen Mixing Station with N2 Line |
Project Owner |
SABIC |
Client |
SAUDI KAYAN |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/05/17 |
Scope of work |
Project involves Supply, Fabrication, Installation, Demolition and Commissioning works for Installation of Oxygen Mixing Station (OMS) with related Nitrogen lines & Valvesin order to maintain the integrity of the OMS system along with associated Nitrogen system.
|
|
SAUDI KAYAN |
Jubail |
01/03/15 |
01/05/17 |
Petrochemical |
Upgrade of PO4 and Eliminox Pumps
Sector |
Petrochemical |
Project Title |
Upgrade of PO4 and Eliminox Pumps |
Project Owner |
SABIC |
Client |
SADAF |
Department |
PSD |
Location |
Jubail |
Start Date |
01/03/15 |
End Date |
01/03/16 |
Scope of work |
Project involves Detail Design & Engineering, Procurement, Fabrication and Supply of material, Modification of Civl Foundation, piping installation with its fittings and valves, Electrical cables and power supply, DCS for pump connection. Including scope to replace existing chemical injection metering (dosing) of four (4no.) Eliminox and eight (8No.) Phosphates pumps with new modified type of dosing pumps including supply of one (1No.) Eliminox and three (3No.) Phosphate pumps as spare.
|
|
SADAF |
Jubail |
01/03/15 |
01/03/16 |
Mining & Minerals |
General Construction Services
Sector |
Mining & Minerals |
Project Title |
General Construction Services |
Project Owner |
MA'ADEN |
Client |
Ma'aden Aluminium |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
01/05/15 |
End Date |
01/05/17 |
Scope of work |
This is a long form contarct which involves Civil & structural works, Pipe works & Valves, Equipment Erection, Mechanical & Electrical Installations, Instrumentation, Painting and Insulation works.
|
|
Ma'aden Aluminium |
Ras Al-Khair |
01/05/15 |
01/05/17 |
Mining & Minerals |
Scaffolding Erection and Dismantling during PAP T/A 2015
Sector |
Mining & Minerals |
Project Title |
Scaffolding Erection and Dismantling during PAP T/A 2015 |
Project Owner |
MA'ADEN |
Client |
MA'ADEN PHOSPHATE |
Department |
SCF |
Location |
Ras Al-Khair |
Start Date |
01/12/14 |
End Date |
01/02/15 |
Scope of work |
Project involves Scaffolding works during Turn Around 2015 PAP plant.
|
|
MA'ADEN PHOSPHATE |
Ras Al-Khair |
01/12/14 |
01/02/15 |
Oil & Gas |
E & I Work For Aramco COGEN Project
Sector |
Oil & Gas |
Project Title |
E & I Work For Aramco COGEN Project |
Project Owner |
Saudi Aramco |
Client |
SAMSUNG |
Department |
E&I |
Location |
Abqaiq |
Start Date |
01/01/15 |
End Date |
01/08/16 |
Scope of work |
Project involves Electrical, Instrumentation, Installation of Cable Tray, Cable Pulling, Lighting, Instrument Installation, Testing, Loop Checking, Transformer Installation, Transformer Testing, Transformer Commissioning, Switch Gear Panel Installation, Field Panel, Termination, Glanding & Grounding.
|
|
SAMSUNG |
Abqaiq |
01/01/15 |
01/08/16 |