Petrochemical |
Electrical and Instrumentation Construction job for FSTF Project
Sector |
Petrochemical |
Project Title |
Electrical and Instrumentation Construction job for FSTF Project |
Project Owner |
Sadara |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
03/08/16 |
End Date |
01/04/17 |
Scope of work |
The scope Contract include: design and engineering services for modifications and repair of the heat tracing systems as well as delivery of the following components and services:
Heat Tracing Design Sheet & Load schedule Schematic/Block Diagrams Panel Single line diagrams Panel Wiring Diagram Datasheets and Catalogues Inspection & Test Plans. Test Certificates & Certificate of Conformity along with ITP. Packing List with detailed shipping information Thermon HTSX Self Regulating Heating Cables Terminator Junction Boxes Accessories for Heat Tracing Systems Thermon PETK Termination Kits Installation of heat tracing material
|
|
SADARA |
Jubail |
03/08/16 |
01/04/17 |
Petrochemical |
Hexane Unloading facility
Sector |
Petrochemical |
Project Title |
Hexane Unloading facility |
Project Owner |
SABIC |
Client |
Yansab |
Department |
PSD |
Location |
Yanbu |
Start Date |
31/07/16 |
End Date |
01/01/17 |
Scope of work |
To Provide unloading Facility for HEXANE ISO container using existing pump. Also Procurement of material, Fabrication & Installation of Nitrogen, Hexane Lines 7 Drain lines.Hydrotesting.Scaffolding.Pre commissioning activities.
|
|
Yansab |
Yanbu |
31/07/16 |
01/01/17 |
Petrochemical |
Installation of New Cables and Trays
Sector |
Petrochemical |
Project Title |
Installation of New Cables and Trays |
Project Owner |
Sadara |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
26/07/16 |
End Date |
01/09/17 |
Scope of work |
Detail Job Scope
i.,,Procure and Lay new cable tray per Sadara Specification and remove the existing cable and tray of Control valves ABV-830410
ii.,,ABV-830410 & FV-830402 valves cable testing, termination, loop checks etc.
iii.,,Procure required bulk components if any for to carryout above.
iv.. Performing all pre-commissioning activities of Cable testing, loop check etc.
|
|
SADARA |
Jubail |
26/07/16 |
01/09/17 |
Petrochemical |
Control valve reinstallation and removel T/A 2016
Sector |
Petrochemical |
Project Title |
Control valve reinstallation and removel T/A 2016 |
Project Owner |
Saudi Chevron |
Client |
Saudi Fal |
Department |
PSD |
Location |
Jubail |
Start Date |
25/07/16 |
End Date |
01/01/17 |
Scope of work |
Control valve reinstallation and removel T/A 2016
Scope of work includes, Lifting, Welding, Installation & Transportation.
|
|
Saudi Fal |
Jubail |
25/07/16 |
01/01/17 |
Petrochemical |
Instrumentation-Modification activities for EJN-00100_Pygas-Benzene_Jumpers_FSTF-RC_corridor-Port
Sector |
Petrochemical |
Project Title |
Instrumentation-Modification activities for EJN-00100_Pygas-Benzene_Jumpers_FSTF-RC_corridor-Port |
Project Owner |
Sadara |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
24/07/16 |
End Date |
01/04/17 |
Scope of work |
To Install a jumper Line between Pyga line and Benzene Line at FSTFBattery Limit to carry high quality(Nitrogen grade) benzene from port to purchased benzene tank in FSTF.
|
|
SADARA |
Jubail |
24/07/16 |
01/04/17 |
Oil & Gas |
Testing of Earthing Pit and Lighting
Sector |
Oil & Gas |
Project Title |
Testing of Earthing Pit and Lighting |
Project Owner |
SABIC |
Client |
Gas Yanbu |
Department |
PSD |
Location |
Yanbu |
Start Date |
18/07/16 |
End Date |
01/01/17 |
Scope of work |
The Scope of Work for this job involves the Preventive Maintenance of the Phase-I/II/III Grounding and lightning system.To do the Inspection of the complete grounding and lightning system & list any abnormalities observed. Cleaning & Tagging of earthing Pit.To review the Location of all electrodes in reference to the As-built drawings & inform any abnormality.To do survey of Lightning system and Condition Monitoring of all related Equipments.
|
|
Gas Yanbu |
Yanbu |
18/07/16 |
01/01/17 |
Petrochemical |
CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
Sector |
Petrochemical |
Project Title |
CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V |
Project Owner |
SABIC / Ar-Razi |
Client |
MHI |
Department |
PSD |
Location |
Jubail |
Start Date |
01/06/16 |
End Date |
01/12/16 |
Scope of work |
CIVIL WORK FOR E-52061-1 FOUNDATION – AR-RAZI PLANT-V
|
|
MHI |
Jubail |
01/06/16 |
01/12/16 |
Oil & Gas |
EXECUTION OF MULTIPLE MOCs
Sector |
Oil & Gas |
Project Title |
EXECUTION OF MULTIPLE MOCs |
Project Owner |
YASREF |
Client |
YASREF |
Department |
PSD |
Location |
Yanbu |
Start Date |
10/07/16 |
End Date |
01/12/16 |
Scope of work |
The scope includes installation of new piping spools, valves and pressure transmitter, internal coating of coolant drums, electrical and instrumentation works. . To supply of material to be used for site execution and commissioning activities. To perform Hydro testing , Flushing, Draining & Pre-commissioning activities.
|
|
YASREF |
Yanbu |
10/07/16 |
01/12/16 |