Petrochemical |
Installation of Electrical Heat Tracing System
Sector |
Petrochemical |
Project Title |
Installation of Electrical Heat Tracing System |
Project Owner |
SADARA |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/02/17 |
Scope of work |
Scope of work includes
1.Extension/Modification of two no. of cables after installation of PRVs in existing pipeline
2. Removal & Reinstatement of heat tracing cable & termination from 8 nos of new
PRVs
|
|
SADARA |
Jubail |
01/12/16 |
01/02/17 |
Petrochemical |
2EG/2UTL Piping and Valves Job Package TAM 2017
Sector |
Petrochemical |
Project Title |
2EG/2UTL Piping and Valves Job Package TAM 2017 |
Project Owner |
SABIC |
Client |
SHARQ |
Department |
PSD |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
01/06/17 |
Scope of work |
Scope of work includes
Piping, Pre-Fabraction, Scaffolding, Marking, cutting and Replacement of the Affected pipe portion according to isometric drawings, steam trap, affected vent, replacement of the sealant box for ethylene line drain, bevling of new piping by pass, Removing & replacement of Isolation valves, Welding & Installation of piping & valves, NDT, Hydrotesting & Commissioning.
|
|
SHARQ |
Jubail |
01/11/16 |
01/06/17 |
Oil & Gas |
Scaffolding Services at Abqaiq Plants
Sector |
Oil & Gas |
Project Title |
Scaffolding Services at Abqaiq Plants |
Project Owner |
Saudi Aramco |
Client |
Abqaiq Plant |
Department |
SCF |
Location |
Abqaiq |
Start Date |
01/11/16 |
End Date |
01/05/18 |
Scope of work |
Scope of work includes
Scaffold Services at Abqaiq Plants including Tower Interior, Tower Exterior & Mobile tower Exterior. Certified Manpower like Scaffolding Supervisors, Scaffolding Inspectors & Work permit Receiver etc are involved in the job.
|
|
Abqaiq Plant |
Abqaiq |
01/11/16 |
01/05/18 |
Petrochemical |
SADAF Plant 74SS1 switchgear enclosure and telemetry system upgrade
Sector |
Petrochemical |
Project Title |
SADAF Plant 74SS1 switchgear enclosure and telemetry system upgrade |
Project Owner |
SABIC / SADAF |
Client |
ABB |
Department |
E&I |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
01/12/16 |
Scope of work |
Scope of work includes
MV & LV Power and Control Cable Termination, Supply of all necessary termination accessories like sleeves, lugs, tags & ferrules, Laying and terminating the Grounding wire & grounding conductor , Dismantling Existing PEC and Moving the associated Equipment (MV SWGR, LV SWGR, Telemetry Panel, Dry Type transformer etc.) to storage yard, RTU Installation
|
|
ABB |
Jubail |
01/11/16 |
01/12/16 |
Petrochemical |
Construction Contract – CO2 – United
Sector |
Petrochemical |
Project Title |
Construction Contract – CO2 – United |
Project Owner |
SABIC / UNITED |
Client |
LINDE |
Department |
PSD |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
01/02/17 |
Scope of work |
Scope of work includes
Structural Steel Fabrication & Installation, Revamping, Drilling, Welding of various weld types of Carbon Steel and Low Temperature Carbon Steel LTCS, Stainless Steel , Cutting, Shop fabrication of process and utility pipe spools, Post Weld Heat Treatment (PWHT),Installation of process and utility Piping, Pipe Rack ,Underground Piping, Labelling of equipment, valves & piping, Non Destructive Examination, Fire Proofing, Cold Insulation, Rigging, Scaffolding, Painting
|
|
LINDE |
Jubail |
01/11/16 |
01/02/17 |
Petrochemical |
General Contract for Construction of RO Water KSA Project Phase II
Sector |
Petrochemical |
Project Title |
General Contract for Construction of RO Water KSA Project Phase II |
Project Owner |
SADARA/DOW |
Client |
FLUOR |
Department |
PSD |
Location |
Jubail |
Start Date |
01/12/16 |
End Date |
01/12/17 |
Scope of work |
Scope of Work includes Installation of Pressure Vessels, Columns and Reactors, piping & Installation of Rotary Equipment like pumps & fans, Installation of Conveyors, Palletizer, Shrink etc.,HVAC, Fire Protection System, Electrical & Instrumentation work including Above Ground Cable Installation, Cable Tray & Condiute Installation ,Cable Pulling, Transformer Installation,Civil(Concrete) work, Plumbing, Painting & Insulation work.
|
|
FLUOR |
Jubail |
01/12/16 |
01/12/17 |
Petrochemical |
Subcontract for Mechanical, Electrical & Instrument Works for SEP(Saudi Elastomers Project ) sSBR Project.
Sector |
Petrochemical |
Project Title |
Subcontract for Mechanical, Electrical & Instrument Works for SEP(Saudi Elastomers Project ) sSBR Project. |
Project Owner |
SABIC / KEMYA |
Client |
DAELIM |
Department |
E&I |
Location |
Jubail |
Start Date |
01/11/16 |
End Date |
October 2018 |
Scope of work |
Scope of Work Includes Procurement, Steel Structure Works, Piping, Scaffolding,Pre Commissioning, Equipment Installation like pumps, Static Mixer, Reactor, Static Condenser, Pipe Supports, Structural Steel Revamping Work, Hot-Dip Galvanized Structural Steel, Electrical & Instrumentation Works, , Valve installations.Painting, Insulation(Hot & Cold) & Construction of Temporary facilities.
|
|
DAELIM |
Jubail |
01/11/16 |
October 2018 |
Mining & Minerals |
Smelter Pot Relining Facility Project – Mechanical, Electrical, Instrumentation and Piping (MEIP) Works
Sector |
Mining & Minerals |
Project Title |
Smelter Pot Relining Facility Project – Mechanical, Electrical, Instrumentation and Piping (MEIP) Works |
Project Owner |
MA'ADEN |
Client |
HATCH |
Department |
PSD |
Location |
Ras Al-Khair |
Start Date |
01/10/16 |
End Date |
01/07/17 |
Scope of work |
Supply & Installation of Compressed Air Piping, Potable & Process water piping, Assembly & Installation of shot blast hood,Installation of Pneumetic Recovery System, Bucket Elevator,Rotary Screen, Shots hopper. Installation of Dust Collector, Rotary valve & bag loading station. Stack Installation 30m High. Design, Fabrication & supply of ductwork & supports,Fabrication & Supply of slide bridge.Supply and installation of Power cable, Eartth Cable. Supply & Installation of complete UPS System, Supply and Installation of the Hot Dipped Galvanized Racking.
|
|
HATCH |
Ras Al-Khair |
01/10/16 |
01/07/17 |