Petrochemical |
Civil Job for Gate 2 and Electrical Works for EJN-00319 E-Stop
Sector |
Petrochemical |
Project Title |
Civil Job for Gate 2 and Electrical Works for EJN-00319 E-Stop |
Project Owner |
SADARA |
Client |
SADARA |
Department |
Civil |
Location |
Jubail |
Start Date |
01/08/17 |
End Date |
01/10/17 |
Scope of work |
Scope of work includes.
Supply, Installation & Testing of New Emergency Stop Push Button, Cable, Conduit & other Miscellaneous Materials. Cutting, Excavating and Removing the existing asphalt layer including the macadam layer,
Excavating and removing the base course and Sub-base course from the location till the
bottom of existing rigid pavement, Compacting the excavated level to the required Proctor Test MDD as per ASTM D 1557, Providing, Casting, Placing and Compacting the Ready Mix cast in situ concrete of Grade C30 at location adjacent to existing road block at gate 2,
|
|
SADARA |
Jubail |
01/08/17 |
01/10/17 |
Petrochemical |
Supply of Instrument Technicians during MTBE T/A 2015
Sector |
Petrochemical |
Project Title |
Supply of Instrument Technicians during MTBE T/A 2015 |
Project Owner |
SABIC |
Client |
IBN-ZAHR |
Department |
Human Resorce Services |
Location |
Jubail |
Start Date |
|
End Date |
|
Scope of work |
The project scope includes supply of manpower (instruments technicians) to fulfil the T/A requirement during MTBE T/A 2015.
|
|
IBN-ZAHR |
Jubail |
|
|
Petrochemical |
Fabrication of (5) Nos. of BRM Operator Shelter Offices in MTBE Plant
Sector |
Petrochemical |
Project Title |
Fabrication of (5) Nos. of BRM Operator Shelter Offices in MTBE Plant |
Project Owner |
SABIC |
Client |
IBN-ZAHR |
Department |
|
Location |
Jubail |
Start Date |
|
End Date |
|
Scope of work |
The project scope includes procurement, design, engineering, manufacturing, testing, fabrication and supply of 05 No. of Blast Proof Portables (explosion proof cabins) for the MTBE plant.
|
|
IBN-ZAHR |
Jubail |
|
|
Petrochemical |
In-Field Cable Pulling for Limit Switch and Work Inside PIB
Sector |
Petrochemical |
Project Title |
In-Field Cable Pulling for Limit Switch and Work Inside PIB |
Project Owner |
SADARA |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
01/07/17 |
End Date |
01/09/17 |
Scope of work |
Scope of work include.
Installation of Cables for Panel to Panel Interconnection inside PIB
Wiring of Cables as per Provided ILDs.
Installation of Cable Panel to Panel inside PIB
Ferruling & Cable Tagging
Re-wire the current connection by changing current terminal to new terminal
Cable Testing & Loop Checking
|
|
SADARA |
Jubail |
01/07/17 |
01/09/17 |
Oil & Gas |
Khurais Oil Train 1,2,3 & 4 Plant SD Hydrotorque Flange Bolts
Sector |
Oil & Gas |
Project Title |
Khurais Oil Train 1,2,3 & 4 Plant SD Hydrotorque Flange Bolts |
Project Owner |
Saudi Aramco |
Client |
Aramco Khurais |
Department |
BT |
Location |
Khurais |
Start Date |
01/06/17 |
End Date |
01/12/17 |
Scope of work |
Bolt Torquing & Tensioning Services at Aramco Khurais Facilities for shut down requirement
|
|
Aramco Khurais |
Khurais |
01/06/17 |
01/12/17 |
Oil & Gas |
MPEI Construction Works for GAS Yanbu Nitrogen Generation Unit Project – NGU
Sector |
Oil & Gas |
Project Title |
MPEI Construction Works for GAS Yanbu Nitrogen Generation Unit Project – NGU |
Project Owner |
SABIC / GAS Yanbu |
Client |
eTEC Arabia |
Department |
PSD |
Location |
Yanbu |
Start Date |
01/06/17 |
End Date |
01/05/18 |
Scope of work |
Scope of work includes.
Mechanical, Piping, Electrical and instrumentation works. Installation of rotating & Static equipments. Filling of lubrications, installation of steel structure, ground works, installation of anchor bolts, touch up paint, installation for equipment, perlite and catalyst filling, pipe fabrication and erection, FRP pipe erection, valve and inline instrument installation, NDT and hydro test and painting. Installation of Electrical equipment, MCC panels, UPS, BUS DUCT, SCADA equipments, MV/LV & Control cables, Jbs and local Push Button, Cable trays with fitting, light fixtures, light stanchion/poles, cathodic protection and DCS equipments.
|
|
eTEC Arabia |
Yanbu |
01/06/17 |
01/05/18 |
Petrochemical |
LHS Drumming Line in Packaging Centre to provide Electrical Heat Tracing Services
Sector |
Petrochemical |
Project Title |
LHS Drumming Line in Packaging Centre to provide Electrical Heat Tracing Services |
Project Owner |
SADARA |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
01/06/17 |
End Date |
01/09/17 |
Scope of work |
Scope of Works includes.
Installation of Heating Cable (Self-Regulating Type) on newly installed Pipeline, Power Junction Box & Accessories, RTD Sensor, End & Splice Termination Kit, Inline Splice Kit, Fiber Tape. Installation different sizes of Conduit. Installation of Power & RTD cable from EHT Panel at MCC to field. Cable glanding and termination
|
|
SADARA |
Jubail |
01/06/17 |
01/09/17 |
Petrochemical |
Modifications to Combined Pyoil to Fluxoil Line to MFC-Heat Tracing Services
Sector |
Petrochemical |
Project Title |
Modifications to Combined Pyoil to Fluxoil Line to MFC-Heat Tracing Services |
Project Owner |
SADARA |
Client |
SADARA |
Department |
E&I |
Location |
Jubail |
Start Date |
01/06/17 |
End Date |
01/12/17 |
Scope of work |
Scope of Works includes.
Installation of Heating Cable, Power Junction Box & Accessories, RTD Sensor, End & Splice Termination Kit,
Fiber Tape, cable tray, power & RTD cable, Cable glanding and termination.
|
|
SADARA |
Jubail |
01/06/17 |
01/12/17 |