Petrochemical |
Common Temporary Facility for JUPC United EO/EG Ⅲ Project
Sector |
Petrochemical |
Project Title |
Common Temporary Facility for JUPC United EO/EG Ⅲ Project |
Project Owner |
SABIC / United |
Client |
SAMSUNG |
Department |
CSD |
Location |
Jubail |
Start Date |
April 2018 |
End Date |
March 2018 |
Scope of work |
The project scope is a supply, Installation, Testing and commissioning of common Temporary Facility for JUPC United EO/EG III Project
|
|
SAMSUNG |
Jubail |
April 2018 |
March 2018 |
Petrochemical |
Electrical & Instrument Construction Work of YANSAB Debottlenecking project
Sector |
Petrochemical |
Project Title |
Electrical & Instrument Construction Work of YANSAB Debottlenecking project |
Project Owner |
SABIC / YANSAB |
Client |
eTEC Arabia |
Department |
Mech |
Location |
Yanbu |
Start Date |
April 2018 |
End Date |
December 2018 |
Scope of work |
The scope of work includes Electrical & Instrumentation works as mention below.
Installation of Electrical Equipments as per provided MTO. Installation of MCC / MV SWGR / NGR / Capacitor Bank panel, Bust Duct, SCADA / CMADA Equipments, MV / LV & Control Cables, Cable Trays with fittings, Lighting Cables, Lighting Fixtures, Lighting Stanchion / Poles, Grounding & Lighting System, Paging System, Cathodic Protection, Rack Room Equipments, DCS & AMS Panels, Machines Monitoring Protection System, Instrumentation and Control Valves, GC and Conductivity Analyzers Sampling Probes & Accessories, Gas Detector, Conduits & Fittings, SS Tubing, Fabrication and Erection Works and Instrumentation Calibration works.
|
|
eTEC Arabia |
Yanbu |
April 2018 |
December 2018 |
Petrochemical |
Temporary Fence & Gate Work at Sabic United
Sector |
Petrochemical |
Project Title |
Temporary Fence & Gate Work at Sabic United |
Project Owner |
SABIC / United |
Client |
SAMSUNG |
Department |
CSD |
Location |
Jubail |
Start Date |
March 2018 |
End Date |
June 2018 |
Scope of work |
The project scope is a Samsung Engineering for supply, installation of temporary fence and gate work.
|
|
SAMSUNG |
Jubail |
March 2018 |
June 2018 |
Petrochemical |
AF-1335012, PCQ1 CCR Interface 1 with PCQ2
Sector |
Petrochemical |
Project Title |
AF-1335012, PCQ1 CCR Interface 1 with PCQ2 |
Project Owner |
SABIC |
Client |
Sabtank Jubail |
Department |
BAS |
Location |
Jubail |
Start Date |
March 2018 |
End Date |
September 2019 |
Scope of work |
Scope of works includes to relocate and or interface the Petro Chemical Quay-1 (PCQ-1) control and safety systems (i.e DCS, ESD, ATG, CCTV, F&G, Emergency Siren, Wireless Communication system as Telephone Hot Lines and IP Telephony system) with Petro Chemical Quay-2 (PCQ-2).
|
|
Sabtank Jubail |
Jubail |
March 2018 |
September 2019 |
Petrochemical |
Field construction work to replace Waste Heat Boliers at Ar-Razi Plant-3&4
Sector |
Petrochemical |
Project Title |
Field construction work to replace Waste Heat Boliers at Ar-Razi Plant-3&4 |
Project Owner |
SABIC / Ar-Razi |
Client |
MHI |
Department |
PSD |
Location |
Jubail |
Start Date |
February 2018 |
End Date |
August 2019 |
Scope of work |
Scope of work includes Mechanical, Piping, Electrical & Instrumentation and Civil works. Replacement of Waste Heat Boiler E-3205 AB and E-4205 AB at Plant-3 &4. Insulation work on the new waste heat boiler. Removal of existing piping supports and insulation. Reinstallation of removed piping, supports and insulation. Removal of structural members, platforms, ladders. Fabrication of temporary steel-structure required to support the existing structure during construction work. Surface preparation, site galvanization for the removed structural members. Removal of identified instruments, cables, cable & branch trays etc. Removal and reinstatement of identified electrical items like lighting poles, cables, cable & branch trays etc. Hydro-testing of reinstalled piping.
|
|
MHI |
Jubail |
February 2018 |
August 2019 |
Oil & Gas |
SHAYBAH NGL 230kV Cable “Testing and Repair”
Sector |
Oil & Gas |
Project Title |
SHAYBAH NGL 230kV Cable “Testing and Repair” |
Project Owner |
Saudi Aramco |
Client |
Shaybah NGL |
Department |
TNC |
Location |
Shaybah NGL |
Start Date |
March 2018 |
End Date |
June 2018 |
Scope of work |
The scope of work includes.
1. Identification of fault in 1CX500 Phase C (Conductor & Sheath).
2. Supply of Cable Joint/Termination kits in case of option -2
3. Installation of joints and termination
4. Testing of the circuit
|
|
Shaybah NGL |
Shaybah NGL |
March 2018 |
June 2018 |
Oil & Gas |
RETROFIT THE DEHYDRATOR VESSEL D-211 AT HwGOSP-4 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM
Sector |
Oil & Gas |
Project Title |
RETROFIT THE DEHYDRATOR VESSEL D-211 AT HwGOSP-4 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM |
Project Owner |
Saudi Aramco |
Client |
Hawiyah GOSP |
Department |
PSD |
Location |
Hawaiyah |
Start Date |
02/01/2018 |
End Date |
02/01/2021 |
Scope of work |
Scope of work includes.
Demolition work for electrical cathode. New work for electrical cathode protection. Demolition work for instrumentation scope. New work for instrumentation scope Demolition work for piping scope. New work for piping scope. Demolition work for civil /structure scope. New work for civil /structure. Demolition work for Mechanical scope. New work for Mechanical scope excluding Vessel shell internal blasting & coating. Blasting & Coating services.
|
|
Hawiyah GOSP |
Hawaiyah |
02/01/2018 |
02/01/2021 |
Mining & Minerals |
Long Term Blanket Contract for Execution of Small And Medium Scale Multi Disciplined Projects
Sector |
Mining & Minerals |
Project Title |
Long Term Blanket Contract for Execution of Small And Medium Scale Multi Disciplined Projects |
Project Owner |
MA'ADEN |
Client |
Ma'aden Phosphate |
Department |
Plant Services |
Location |
Ras Al-Khair |
Start Date |
01/02/18 |
End Date |
01/02/21 |
Scope of work |
The scope of work includes Engineering, Procurement, Construction, Modification, Repair, Pre-Commissioning and Commissioning of multidiscipline project of Civil, Structure, Mechanical, Piping, Electrical and Instrumentation.
|
|
Ma'aden Phosphate |
Ras Al-Khair |
01/02/18 |
01/02/21 |