Oil & Gas |
Provision of Certified Scaffolding Inspector
Sector |
Oil & Gas |
Project Title |
Provision of Certified Scaffolding Inspector |
Project Owner |
SAMREF |
Client |
SAMREF |
Department |
SCF |
Location |
Yanbu |
Start Date |
April 2019 |
End Date |
April 2024 |
Scope of work |
Scope of work includes supply of scaffolding Inspectors (TUV) for SAMREF plant.
|
|
SAMREF |
Yanbu |
April 2019 |
April 2024 |
Oil & Gas |
Mechanical Support for Rotary Equipment Overhauling for PH-3 T/A 2019
Sector |
Oil & Gas |
Project Title |
Mechanical Support for Rotary Equipment Overhauling for PH-3 T/A 2019 |
Project Owner |
SABIC |
Client |
Gas Jubail |
Department |
PSD |
Location |
Jubail |
Start Date |
March 2019 |
End Date |
April 2019 |
Scope of work |
SOW is related to Mechanical Support for Rotary Equipment Overhauling mentioned below:
Overhauling of MAC (31-K-001) & Lube oil system
Overhauling of O2 Compressor (31-K-002-A/B) & Lube oil system Cleaning
Re-adjustment of Expansion Turbines (31-ET-001-A/B)
Inspection of MAC Coolers & Inlet Filter-New rollomatic and Duracell Cleaning
Cleaning of O2 Compressors Coolers & O2 pipelines
|
|
Gas Jubail |
Jubail |
March 2019 |
April 2019 |
Oil & Gas |
2019 TRS Scaffolding works Riyadh Refinery
Sector |
Oil & Gas |
Project Title |
2019 TRS Scaffolding works Riyadh Refinery |
Project Owner |
Saudi Aramco |
Client |
Riyadh Refinery |
Department |
SCF |
Location |
Riyadh |
Start Date |
April 2019 |
End Date |
March 2021 |
Scope of work |
The scope of work includes supervision, manpower, equipment, transportation, offices, catering and accommodation, materials. The services required to design, transport, erect, disassemble scaffolding based on Saudi Aramco representative request.
|
|
Riyadh Refinery |
Riyadh |
April 2019 |
March 2021 |
Oil & Gas |
Voltage Conversion at HDGOSP-2
Sector |
Oil & Gas |
Project Title |
Voltage Conversion at HDGOSP-2 |
Project Owner |
Saudi Aramco |
Client |
HDGOSP-2 |
Department |
TNC |
Location |
Haradh |
Start Date |
April 2019 |
End Date |
January 2022 |
Scope of work |
The project scope includes to replace the existing voltage of 208/120V power distribution system to new 400/230V system for Non-industrial buildings and switchgear building at Haradh GOSP-2 facilities.
|
|
HDGOSP-2 |
Haradh |
April 2019 |
January 2022 |
Oil & Gas |
Annual Maintenance Contract for Mechanical, Welding & Fabrication Services
Sector |
Oil & Gas |
Project Title |
Annual Maintenance Contract for Mechanical, Welding & Fabrication Services |
Project Owner |
SABIC |
Client |
Gas Yanbu |
Department |
PSD |
Location |
Jubail |
Start Date |
April 2019 |
End Date |
April 2020 |
Scope of work |
The scope of work cover all welding, machining and fabrication activities which needed in GAS Yanbu plant. It is a unit rate contract and materials include such as Aluminum, stainless steel and carbon steel for construction.
|
|
Gas Yanbu |
Jubail |
April 2019 |
April 2020 |
Petrochemical |
Blast Proof Office Cabin Rental EDC TA19
Sector |
Petrochemical |
Project Title |
Blast Proof Office Cabin Rental EDC TA19 |
Project Owner |
SABIC |
Client |
SADAF |
Department |
RGSS |
Location |
Jubail |
Start Date |
February 2019 |
End Date |
April 2019 |
Scope of work |
Supply of blast proof cabins on rental basis for EDC shutdown in Jun- 2019. The number of BRMs required are 11 Nos. Service engineer will be available on call basis for any maintenance and trouble shooting.
|
|
SADAF |
Jubail |
February 2019 |
April 2019 |
Petrochemical |
BRM Office Rental for 9 Personnel with Generator
Sector |
Petrochemical |
Project Title |
BRM Office Rental for 9 Personnel with Generator |
Project Owner |
Saudi Chevron |
Client |
Saudi Chevron |
Department |
RGSS |
Location |
Jubail |
Start Date |
February 2019 |
End Date |
July 2019 |
Scope of work |
Supply of Blast Resistance Modules – 10Psi 200ms (40 X 12 FT) along with 50 KVA Generators.
|
|
Saudi Chevron |
Jubail |
February 2019 |
July 2019 |
Oil & Gas |
MFC- Installation 21 CCTV Cameras as SONPD
Sector |
Oil & Gas |
Project Title |
MFC- Installation 21 CCTV Cameras as SONPD |
Project Owner |
Saudi Aramco |
Client |
SONPD |
Department |
BAS |
Location |
SONPD |
Start Date |
February 2019 |
End Date |
December 2019 |
Scope of work |
The scope of work includes supply, installation, testing and commissioning of 21 CCTV Cameras at SONPD
|
|
SONPD |
SONPD |
February 2019 |
December 2019 |