Project: RETROFIT THE DEHYDRATOR VESSEL AT SHGOSP-5 WITH DUAL FREQUENCY DESALTING (DFD) SYSTEM
Client: Shedgum GOSP-5
Completion Year: 2018
Prime Contractor:
Scope of Work: Its includes demolition of Internal Headers, Distributors, Grids, Transformers and Bushings (for both D-211 and D-212). Installation of Vessel Components (Oil Headers, Effluent Water Collector-D-211, Interface draw-off collectors, hangers and support framers, Electrodes, Dual Frequency (DF) Power Units, High Voltage Bushings and Electrode Assemblies, DFD LRC II Control Panel (Control room and interface with DCS & ESD), new nozzles, 480V Power Supply units, level Transmitters).
Location: Shedgum
Its includes demolition of Internal Headers, Distributors, Grids, Transformers and Bushings (for both D-211 and D-212). Installation of Vessel Components (Oil Headers, Effluent Water Collector-D-211, Interface draw-off collectors, hangers and support framers, Electrodes, Dual Frequency (DF) Power Units, High Voltage Bushings and Electrode Assemblies, DFD LRC II Control Panel (Control room and interface with DCS & ESD), new nozzles, 480V Power Supply units, level Transmitters).