Project: Repair Monel Chutes & Centrifuge during EDC TA’19
Client: SADAF
Completion Year: 2019
Prime Contractor:
Scope of Work: The scope of work includes, Sand blasting for chutes to remove any Belzona and other contaminations and Bottom casing flange to remove any Belzona and other contaminations. Perform Neutralization (to remove Caustic) for all weld joints & surface cracks for chutes & centrifuge bottom casing flange. Perform weld seam repairs and cracks repairs as per findings. Plates/flanges replacements may also be required as per findings or crack during repair work. Drilling for chute flanges with bottom casing flange. Weld build up and machining for centrifuge bottom casing flanges, as per findings (ensure flatness for flanges, to avoid any leakage). Perform DPT after final weld repairs and machining. Drilling and tapping for centrifuge bottom flange holes.
Location: Jubail
The scope of work includes, Sand blasting for chutes to remove any Belzona and other contaminations and Bottom casing flange to remove any Belzona and other contaminations. Perform Neutralization (to remove Caustic) for all weld joints & surface cracks for chutes & centrifuge bottom casing flange. Perform weld seam repairs and cracks repairs as per findings. Plates/flanges replacements may also be required as per findings or crack during repair work. Drilling for chute flanges with bottom casing flange. Weld build up and machining for centrifuge bottom casing flanges, as per findings (ensure flatness for flanges, to avoid any leakage). Perform DPT after final weld repairs and machining. Drilling and tapping for centrifuge bottom flange holes.