Project: Refurbishment Of Heater, Ducts & Stack
Client: IBN RUSHD
Completion Year: 2013
Prime Contractor:
Scope of Work: Revamping Of Heater, Re-Installation Of stack, removal & Re-Installation Of Heater Ducts & Re-tubing Of Heater • Installation of new fabricated stack elevation up to 80 meters • Dismantling of Heater A. • Dismantle / Install radiant and convection tubes • Dismantle / Repair / Install stack connecting ducts • Removal of damaged stack portion at elevation 40 meters • Repair outer heater shell • Scaffolding erection for removal of damaged stack • Installation of free issued expansion joints. • All electrical and instrumentation removal and re-installation • Rolling of free issued plates for heater casing.
Location: Yanbu
Revamping Of Heater, Re-Installation Of stack, removal & Re-Installation Of Heater Ducts & Re-tubing Of Heater
• Installation of new fabricated stack elevation up to 80 meters
• Dismantling of Heater A.
• Dismantle / Install radiant and convection tubes
• Dismantle / Repair / Install stack connecting ducts
• Removal of damaged stack portion at elevation 40 meters
• Repair outer heater shell
• Scaffolding erection for removal of damaged stack
• Installation of free issued expansion joints.
• All electrical and instrumentation removal and re-installation
• Rolling of free issued plates for heater casing.