Project: PMDI & TDI Project(SADARA Isocyanate Project)
Client: DAELIM
Completion Year: 2016
Prime Contractor:
Scope of Work: Scope of Work Includes MCC & Switchgears installation. Low voltage transformers and Power distribution panels installation, Power transformers installation. Testing of switchgear, MCC, transformers including breakers, CT, PT bus bars & various relays.Installation of lighting fixtures. Installation of conduit, cable tray and cable pulling, Cable glanding, termination & testing. Grounding system installation. Heat tracing & cathodic protection system.Instrument calibration, Instrument JB installation. Instrument DCS & PLC, SCADA panels installation, Wiring, glanding & termination, Cable tray, conduit, duct bank installation. Loop check, Inst. Impulse tubing & Inst. Air line installation and leak test.
Location: Jubail
Scope of Work Includes MCC & Switchgears installation. Low voltage transformers and Power distribution panels installation, Power transformers installation. Testing of switchgear, MCC, transformers including breakers, CT, PT bus bars & various relays.Installation of lighting fixtures. Installation of conduit, cable tray and cable pulling, Cable glanding, termination & testing. Grounding system installation. Heat tracing & cathodic protection system.Instrument calibration, Instrument JB installation. Instrument DCS & PLC, SCADA panels installation, Wiring, glanding & termination, Cable tray, conduit, duct bank installation. Loop check, Inst. Impulse tubing & Inst. Air line installation and leak test.