Project: MFC for Upgrade of 2.4kv Field Switches with 13.8kv and Procure of 2 Existing Obsolete 2.4kv Breaker
Client: Ras Tanura
Completion Year: 2020
Prime Contractor:
Scope of Work: The Project Scope is to carry out Complete Electrical works for upgrading the electrical power system at West Pier. The details scope of work includes, Evaluate and calculate the load requirements including existing equipment and all new equipment of 2.4KV Field Switches with 13.8 Kv and Procure of 2 Existing Obsolete 2.4kv Breaker. Supply and installation of 12 No's of SF 6 switches (13.8 Kv Volts), 2 No's of 2.4 Kv rolling breakers for spares & Conduit and fittings installation. Excavate and lay power cable from the 5.0 k Volts power panel to all portable offices, all existing and new equipment.
Location: Ras Tanura
The Project Scope is to carry out Complete Electrical works for upgrading the electrical power system at West Pier. The details scope of work includes, Evaluate and calculate the load requirements including existing equipment and all new equipment of 2.4KV Field Switches with 13.8 Kv and Procure of 2 Existing Obsolete 2.4kv Breaker. Supply and installation of 12 No’s of SF 6 switches (13.8 Kv Volts), 2 No’s of 2.4 Kv rolling breakers for spares & Conduit and fittings installation. Excavate and lay power cable from the 5.0 k Volts power panel to all portable offices, all existing and new equipment.