Project: LSTK Contract For Recovered Water Line
Client: SADAF
Completion Year: 2014
Prime Contractor:
Scope of Work: Lump Sum Turnkey project (Design, Supply & Construction for Pipe line of about 8Km in RC corridors.) • Detailed Design of the new location of pipeline in RC Corridor. • Replace the recovery water line, 14 inch Dia • Procured, prefabricated, supply and constructed at site. • Cutting, dismantling and removal of the existing, 14 inch recovery water line • Scaffolding Work • Electrical and communication
Location: Jubail
Lump Sum Turnkey project (Design, Supply & Construction for Pipe line of about 8Km in RC corridors.)
• Detailed Design of the new location of pipeline in RC Corridor.
• Replace the recovery water line, 14 inch Dia
• Procured, prefabricated, supply and constructed at site.
• Cutting, dismantling and removal of the existing, 14 inch recovery water line
• Scaffolding Work
• Electrical and communication