Project: Independent Line for PK BoG Project // PK Tail Gas Pgase II // MOC-5471, SP-191400011

Client: Ar-Razi

Completion Year: 2020

Prime Contractor:

Scope of Work: The scope of work is procurement, fabrication, installation of piping, electrical, instrumentaiton, civil, structural, and architectural works for the PK Tail Gas Project. It invlves demolition of existing lines, installation of modified lines, control valves, pipe supports, NDE, RT and PT. It also includes suppply of power for CP, associated instruments, pressure transmitters, excavation & backfilling for U/G pipes, steel structures as well as asphalt concrete paving road works.

Location: Jubail

The scope of work is procurement, fabrication, installation of piping, electrical, instrumentaiton, civil, structural, and architectural works for the PK Tail Gas Project. It invlves demolition of existing lines, installation of modified lines, control valves, pipe supports, NDE, RT and PT. It also includes suppply of power for CP, associated instruments, pressure transmitters, excavation & backfilling for U/G pipes, steel structures as well as asphalt concrete paving road works.

Our Presence

Our offices and branches throughout the region

Headquarters

P.O. Box 11049 Tareeq 114 Jubail Industrial City 31961 Kingdom of Saudi Arabia Tel: +966-13-341-2343 Fax: +966-13-341-1288 e-mail: sendan@sendan.com.sa

Affiliates and group companies

Saudi Arabia

  • SENDAN International Company Limited, Yanbu
  • SENSORTECH Saudi Manufacturing Company,
    Al-Khobar
  • MAWAD SENDAN Trading,
    Al-Khobar
  • Basees SENDAN Security Technology, Dammam

United Arab Emirates

  • SENDAN International FZCO, Dubai.

Qatar 

  • First SENDAN Contracting & Trading Co. WLL, Doha

Korea

  • SENDAN Korea Limited, Seoul.

India

  • SENDAN International Telecom Private Limited, Mumbai
  • Crebri Technologies Private Limited, Noida