Scope of Work: Scope of work include. Installation of Cables for Panel to Panel Interconnection inside PIB Wiring of Cables as per Provided ILDs. Installation of Cable Panel to Panel inside PIB Ferruling & Cable Tagging Re-wire the current connection by changing current terminal to new terminal Cable Testing & Loop Checking
Location: Jubail
Scope of work include.
Installation of Cables for Panel to Panel Interconnection inside PIB
Wiring of Cables as per Provided ILDs.
Installation of Cable Panel to Panel inside PIB
Ferruling & Cable Tagging
Re-wire the current connection by changing current terminal to new terminal
Cable Testing & Loop Checking