Project: Hadeed – SPLP1, Upgradation of CCM3, Dedusting System / Material Handling System
Client: SAUDI VOEST - ALPINE
Completion Year: 2016
Prime Contractor:
Scope of Work: Project involves upgradation Continious Casting Machine, Dedusting Plant & Material Handling System. Disconnection and Reconnection of 3.5MVA oil Transformer, Installation and Connection of Cast Resin Transformer (1.6MVA & 1.25MVA), Upgradation of vibrating Feeder of Silos, Conveyor Belt Electrics & Automation. Removal & Installation of Panels (New Dedusting Electric Building, Material Handling Load Center Room, Kuttner Room, EAF1PLC Room). Dismantling entire existing CCM3 equipment, structure and piping. Disposal of all dismantled Structures, Equipment at Hadeed laydown area. Installation of new Structures and Equipment. Installation of Utility Equipment.
Location: Jubail
Project involves upgradation Continious Casting Machine, Dedusting Plant & Material Handling System. Disconnection and Reconnection of 3.5MVA oil Transformer, Installation and Connection of Cast Resin Transformer (1.6MVA & 1.25MVA), Upgradation of vibrating Feeder of Silos, Conveyor Belt Electrics & Automation. Removal & Installation of Panels (New Dedusting Electric Building, Material Handling Load Center Room, Kuttner Room, EAF1PLC Room). Dismantling entire existing CCM3 equipment, structure and piping. Disposal of all dismantled Structures, Equipment at Hadeed laydown area. Installation of new Structures and Equipment. Installation of Utility Equipment.