Project: Grease for ZV-120/ZV-125 @ FGC (Maintenance of Valves)
Client: Shedgum Gas Plant
Completion Year: 2018
Prime Contractor:
Scope of Work: The scope of work includes to apply HP grease to stop the passing issue for the ZV-120 at FGC. Online sealant injection to arrest seat leakages of Pipeline valves.
Location: Shedgum
The scope of work includes to apply HP grease to stop the passing issue for the ZV-120 at FGC. Online sealant injection to arrest seat leakages of Pipeline valves.