Project: Electrical works for MP-EVA0-B-01-04-61 -Ethylene Pump at EVA plant.
Client: SIPCHEM
Completion Year: 2016
Prime Contractor:
Scope of Work: Scope of work includes • Erection / dismantling of scaffolding along with existing pipe rack. • 3 Runs, 440 meters of 3CX150mm2 power cable will be laid on existing cable tray/ladders from MCC panel to the consumer junction box. • 1 Run, 440 meter of 5CX2.5mm2 control cable will be laid on existing cable trays/ladders from MCC panel to LCS. • 1 Run, of 3CX150mm2 Power cable will be laid on existing cable trays./ladders from consumer junction box to the vendor junction box.
Location: Jubail
Scope of work includes
• Erection / dismantling of scaffolding along with existing pipe rack.
• 3 Runs, 440 meters of 3CX150mm2 power cable will be laid on existing cable tray/ladders from MCC panel to the consumer junction box.
• 1 Run, 440 meter of 5CX2.5mm2 control cable will be laid on existing cable trays/ladders from MCC panel to LCS.
• 1 Run, of 3CX150mm2 Power cable will be laid on existing cable trays./ladders from consumer junction box to the vendor junction box.