Project: Civil Job for Gate 2 and Electrical Works for EJN-00319 E-Stop
Client: SADARA
Completion Year: 2017
Prime Contractor:
Scope of Work: Scope of work includes. Supply, Installation & Testing of New Emergency Stop Push Button, Cable, Conduit & other Miscellaneous Materials. Cutting, Excavating and Removing the existing asphalt layer including the macadam layer, Excavating and removing the base course and Sub-base course from the location till the bottom of existing rigid pavement, Compacting the excavated level to the required Proctor Test MDD as per ASTM D 1557, Providing, Casting, Placing and Compacting the Ready Mix cast in situ concrete of Grade C30 at location adjacent to existing road block at gate 2,
Location: Jubail
Scope of work includes.
Supply, Installation & Testing of New Emergency Stop Push Button, Cable, Conduit & other Miscellaneous Materials. Cutting, Excavating and Removing the existing asphalt layer including the macadam layer,
Excavating and removing the base course and Sub-base course from the location till the
bottom of existing rigid pavement, Compacting the excavated level to the required Proctor Test MDD as per ASTM D 1557, Providing, Casting, Placing and Compacting the Ready Mix cast in situ concrete of Grade C30 at location adjacent to existing road block at gate 2,