2019 TRS Scaffolding works Riyadh Refinery
05-23-2020 | Posted inThe scope of work includes supervision, manpower, equipment, transportation, offices, catering and accommodation, materials. The services required to design, transport, erect, disassemble scaffolding based on Saudi Aramco representative request.
Read MoreVoltage Conversion at HDGOSP-2
05-23-2020 | Posted inThe project scope includes to replace the existing voltage of 208/120V power distribution system to new 400/230V system for Non-industrial buildings and switchgear building at Haradh GOSP-2 facilities.
Read MoreAnnual Maintenance Contract for Mechanical, Welding & Fabrication Services
05-23-2020 | Posted inThe scope of work cover all welding, machining and fabrication activities which needed in GAS Yanbu plant. It is a unit rate contract and materials include such as Aluminum, stainless steel and carbon steel for construction.
Read MoreBlast Proof Office Cabin Rental EDC TA19
05-23-2020 | Posted inSupply of blast proof cabins on rental basis for EDC shutdown in Jun- 2019. The number of BRMs required are 11 Nos. Service engineer will be available on call basis for any maintenance and trouble shooting.
Read MoreBRM Office Rental for 9 Personnel with Generator
05-23-2020 | Posted inSupply of Blast Resistance Modules - 10Psi 200ms (40 X 12 FT) along with 50 KVA Generators.
Read MoreMFC- Installation 21 CCTV Cameras as SONPD
05-23-2020 | Posted inThe scope of work includes supply, installation, testing and commissioning of 21 CCTV Cameras at SONPD
Read MoreRemoval- Re-Installation of Valves, PSVs, CVs, Sea Water Valves, Sea Water Headers and MISC job
05-23-2020 | Posted inThe SOW includes Blinding & De-blinding of the Equipment’s, Opening & Box up of the Equipment’s, and Torque Tightening of all related flanges which will be opened during TA. The equipment include: • SW Headers (Supply & Return) • SW valves (59 no.) • Block valves / Critical Valves (169...
Read MoreLong Term Agreement for All types of Machinery & Fabrication Services to Sahara affiliates (3 Years)
05-23-2020 | Posted inThe project scope is to carry out LTA for all types of Machinery and Fabrication services to Sahara Affiliates for a period of three years. It includes Machining Repair, Fabrication Repair and all inspection findings during break down.
Read More