Construction Of Amine Surge Tank & Replacement During S/D.
05-23-2020 | Posted inDesign, Procurement, Fabrication & Construction Works
Read MoreRepair of Caustic Tank During ShutDown
05-23-2020 | Posted inProcurement, Fabrication & Construction Works
Read MoreEngineering Fabrication and Installation of Handhole & N2 Purging Nozzles
05-23-2020 | Posted inEngineering, Construction. (Mechanical Works)
Read MoreInstallation of Fire Fighting System at Tasnee
05-23-2020 | Posted inSupply, Contruction work Like Piping/ Repair welding 7 Painting & NDT, (Mechanical Works)
Read MoreShip Loading arm base plate modification and other misc. structure modification
05-23-2020 | Posted inModification Of Plateform At Berth, Base Plate Modification Of Loading Arm At Two Different Berths. (Mechanical Works)
Read MoreEmergency Shut Down/Spool Repair and other maintenance Work
05-23-2020 | Posted inMechanical Works
Read MoreInstallation of Nitrogen Compressor
05-23-2020 | Posted inMechanical, Civil, Electrical & Instrumentation Works
Read MoreConnecting the pump with pipe
05-23-2020 | Posted inMechanical work along with piping modification
Read More