Supply of piping and structural materials, installation, testing and commissioning of pressure control valve
05-23-2020 | Posted inResizing Of Pressure Control Valve, Involving Piping modification & Instrumaentation Works.
Read MoreConstruction & Erection of pumps
05-23-2020 | Posted inInvolves Mechanical, Civil plus E&I Involves Procurement & Construction along with testing & commissioning Includes Removal & Installation of existing pump. Pump associated pipping & fabrication work. Civil Work foundation.
Read MoreDMDS Platform installation
05-23-2020 | Posted inStructure fabrication and erection for DMDS Platform installation Project
Read MoreARV Isolation Valve installation
05-23-2020 | Posted inPiping modification for ARV Isolation Valve installation Project
Read MoreOutstanding PSSR tank farm
05-23-2020 | Posted inMechanical, Pipipng, Equipment and Structural work for PSSR tank farm Project at Tasnee
Read MoreSite Constructionn Works For Four (4) Project During IBB T/A
05-23-2020 | Posted inSupply of Piping Material, Fabrication and installation activities during Four (4) Project During IBB T/A
Read MoreIndividual Lube Oil Console for BFW pumps 1P-8004A/B/C/D)
05-23-2020 | Posted inLSTK, Design, Fabrication, Installation & commisioning. Involes all three Dicipline (Mechanical, Civil, E&I)
Read MoreReplacement of Glycol Pre-Heater 2E-1401 A/B)
05-23-2020 | Posted inRemoval & Reinstallation Of Pre-Heater during TAM for the Replacement of Glycol Pre-Heater 2E-1401 A/B) Project at SHARQ EG2