Upgrade Ejector & Silencer Project Unit 220
05-23-2020 | Posted inLSTK job involving detailed Engineering, Procurement of long lead items, Civil Structure, Piping & instrumentation work such as, Piping Modifcations, replacement of MOVs, Painting & Sand Blasting, NDT, Removal 0f Existing Ejecter & Silincer then Installtion of New Ejecter & Silincer. Silincer Foundation,
Read MoreLSTK services for 8″ GAN pipeline to ABS-PK
05-23-2020 | Posted inLSTK Job, Involves Engineering, Procuremnt & construction (Mechanical, Electrical, Civil & Intrumentational Works)
Read More31-AG-2001 BUTTERFLY VALVE TO BE REPAIR
05-23-2020 | Posted inInstalltion Of Betterfly valve & its associate piping
Read MorePiping & Structure Job for ASU Gas Phase#8
05-23-2020 | Posted inMechanical Structural, Piping, equipment. Installation and Erection of Cold Box Erection
Read MorePR for procurement & construction of Auto Dumpig Area
05-23-2020 | Posted inPiping(Procurement & Installation) & Instrumentational Work for the construction of Auto Dumpig Area at IBB.
Read MoreYanbu III Pump Removal & Re-Installation
05-23-2020 | Posted inTo remove the existing Sea Water Pumps & Install new Sea Water Pumps and their associate piping.
Read MoreConstruction of 19 NOs, of TIE-IN for 4th Decanter for Reliability Project
05-23-2020 | Posted inPiping Tie in at different points on different line sizes (16", 14", 8", 4", 2") . (Mechanical Work), Procurement of all material & Mechenical Construction.
Read More