Installation of Drum Loading Station
05-23-2020 | Posted inThis project involves all the discipline Mechanical, E & I, Civil, Scaffolding. Fabrication and Erection of Piping and Pipe Supports, Erection of Steel Structure, Fiber Optic Cable and Power Cable Laying, along with Civil, Scaffolding works,
Read MoreControlled Bolting & onsite machining services for DGA shutdown
05-23-2020 | Posted inControlled Bolting & onsite machining services for DGA shutdown
Read More1EG Piping and Valves Repair Works (Area12&14)
05-23-2020 | Posted inProject involves repair of piping and valves in 1EG plant during 2015 TAM. The scope involves pre-fabrication activities, Tagging of jobs, Radiography & toucup painting,
Read MoreThermal Exp. Vessel construction
05-23-2020 | Posted inProject scope includes Engineering, procurement, supply, installation, testing and pre commissioning of new EO Thermal expansion vessel at SAUDI KAYAN Plant. The brief scope includes Design and detail engineering works for new EO Thermal expansion vessel installation, Supply of 01 EO Thermal expansion vessel, related piping and instruments, Civil foundation...
Read MoreFlame Scanner in Olefins Plant
05-23-2020 | Posted inProject involves Design and Detailed Engineering, of Upgradation of Replacing UV-IR type Flame Scanner. Procure Flame Scanner, Instrument Cables, involving Dismantling & Installation of Flame Scanner, Cabling with JB's, DCS and BMS configuration, Testing & Commissioning.
Read MoreUpgrade Transformers 6 & 7 with Power Cables
05-23-2020 | Posted inProject involves Design and Detailed Engineering of upgradation of transformers, Removal & Installation of Transformer shed, Dismantling & Installation of New Transformer, Modification of New Civil Foundation and Roof structural works including dismantling of existing 1.5MVA Transformer, LV bus duct, Relay setting for upstream and downstream, Testing & Commissioning.
Read More