Requirement of scaffolding and green net
05-23-2020 | Posted inScaffolding Erection with green net screen installation at transfer tower counterweights and acceleration chutes in critical dust accumulation areas.
Read MoreReplacement of damaged Fiber cable L0541
05-23-2020 | Posted inReplacement of damaged Fiber cable at SADARA plant.
Read MoreSump Concrete Walls Repair and Install Steel Liner
05-23-2020 | Posted inThis project involves Removal/Demolition of existing RCC sump pump; Insall steel liner Plates & leak detector tube inside sump; Reinstate top slab with new precast slab & steel plates; Reinstall all affected connections
Read MoreConstruct New Chemical Storage Area
05-23-2020 | Posted inThis project involves construction of new chmical storage area with ramp; supply of material (permanent and consumable), tools, labors, equipment, supervision, mobilization & demobilization and miscellaneous services necessary to do the required work.
Read MoreRequest for Toruqe Tools
05-23-2020 | Posted inTo supply torque tools(Hydraulic torque wrenches) with the torque capacity as per requirement of Aramco.
Read MoreImplementation of EG 1&2 and LAO MOCS
05-23-2020 | Posted inFabrication of spools,Hydrotesting of lines, disconnection and removal of instruments,modification of steel structure,installation of control valves and new lines, loopchecking, installation of new reboilers,installation of steam tracing, scaffolding and insulation
Read More