Civil Work for EO Sales Gas Filter Project
05-23-2020 | Posted inTHIS PROJECT JOB SCOPE COVERS Pipe lines fabrication and installation work of Sales Gas Filter at SADARA EO Plant. Removal of existing temporary structure, Concrete Work and Installation of Pedestals
Read MoreInstallation of C20 Filter to capture Polymer LAO (Linear alpha olifines)
05-23-2020 | Posted inDuring LAO plant T/A, Following activities were performed, Design, Engineering, Supply, Installation,Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product. along with associated site works including Piping, Fabrication, Welding, Civil/ structural Work for routing of pipes and...
Read MoreElectrical and Instrumentation Construction job for FSTF Project
05-23-2020 | Posted inThe scope Contract include: design and engineering services for modifications and repair of the heat tracing systems as well as delivery of the following components and services: Heat Tracing Design Sheet & Load schedule Schematic/Block Diagrams Panel Single line diagrams Panel Wiring Diagram Datasheets and Catalogues...
Read MoreHexane Unloading facility
05-23-2020 | Posted inTo Provide unloading Facility for HEXANE ISO container using existing pump. Also Procurement of material, Fabrication & Installation of Nitrogen, Hexane Lines 7 Drain lines.Hydrotesting.Scaffolding.Pre commissioning activities.
Read MoreInstallation of New Cables and Trays
05-23-2020 | Posted inDetail Job Scope i.,,Procure and Lay new cable tray per Sadara Specification and remove the existing cable and tray of Control valves ABV-830410 ii.,,ABV-830410 & FV-830402 valves cable testing, termination, loop checks etc. iii.,,Procure required bulk components if any for to carryout above. iv.. Performing all pre-commissioning activities of Cable...
Read MoreControl valve reinstallation and removel T/A 2016
05-23-2020 | Posted inControl valve reinstallation and removel T/A 2016 Scope of work includes, Lifting, Welding, Installation & Transportation.
Read MoreInstrumentation-Modification activities for EJN-00100_Pygas-Benzene_Jumpers_FSTF-RC_corridor-Port
05-23-2020 | Posted inTo Install a jumper Line between Pyga line and Benzene Line at FSTFBattery Limit to carry high quality(Nitrogen grade) benzene from port to purchased benzene tank in FSTF.
Read MoreTesting of Earthing Pit and Lighting
05-23-2020 | Posted inThe Scope of Work for this job involves the Preventive Maintenance of the Phase-I/II/III Grounding and lightning system.To do the Inspection of the complete grounding and lightning system & list any abnormalities observed. Cleaning & Tagging of earthing Pit.To review the Location of all electrodes in reference to the As-built...