SADAF Plant 74SS1 switchgear enclosure and telemetry system upgrade
05-23-2020 | Posted inScope of work includes MV & LV Power and Control Cable Termination, Supply of all necessary termination accessories like sleeves, lugs, tags & ferrules, Laying and terminating the Grounding wire & grounding conductor , Dismantling Existing PEC and Moving the associated Equipment (MV SWGR, LV SWGR, Telemetry Panel, Dry Type...
Read MoreConstruction Contract – CO2 – United
05-23-2020 | Posted inScope of work includes Structural Steel Fabrication & Installation, Revamping, Drilling, Welding of various weld types of Carbon Steel and Low Temperature Carbon Steel LTCS, Stainless Steel , Cutting, Shop fabrication of process and utility pipe spools, Post Weld Heat Treatment (PWHT),Installation of process and utility Piping, Pipe Rack ,Underground...
Read MoreInquiry for 112-K-0003, Restoration Work, YASREF EPC-4
05-23-2020 | Posted inScope of work includes Make Up H2 Compressor(112-K-0003) Train B Erection & Dismantling Work,. Dismantling & Installation of Roof Clading & Structure for Compressor Motor & Compressor Frame, Piping(Fire Water, Vent Piping, Cooling Water). Electrical & Instrument Work including,Pre-Commissioning & Commissioning Assistance, Foundation Works(Grouting & Rectification of cracks on foundation).
Read MoreElectric Heat Tracing Services
05-23-2020 | Posted inMaintenance of Electric heat tracing System,To provide Inventory spare parts for each system. To provid Engineering Design Package for any modifications supported with required statndars & Drawings.To perform Through maintenance checkup for each System
Read MoreConstruction of Ammonia and Urea Operator Cabin
05-23-2020 | Posted inThe scope includes Design, Procurement, Construction of Ammonia & Urea Operator Cabin. Specialized Manpower like Fabricator, Steel Fixer, Rigger & Carpenter were involved in the job.
Read MoreFilter Foundation work YANPET U10 CSU PROJECT
05-23-2020 | Posted inScope of work includes Earth work( Site preparation Excavation (including Concrete Paving Demolition), Back Fill & Compaction,Disposal). Concrete Work(Structural Concrete,Lean Concrete,Form Work For Foundation, Re-Bar,Non-Shrinkage Grout (for Steel structure work),Joint & Sealant) & Coating Wok
Read MoreMISC & MOC EXECUTION WORKS at YASREF Facility
05-23-2020 | Posted inThe project scope includes Pipes and Valve Fittings, Blinding, De-blinding, Measuring, cutting, grinding,welding, threading,pipefitting and installing pipes up to 56" inches diameter, Install and remove valves up to 56" inches diameter, Cold cutting of piping, as required.,Pre and Post Weld Heat Treatment,Painting, Cleaning and Grit Blasting, Insulation Work,Scaffolding - Design,...
Read MoreBOLT TENSIONING & ON-SITE MACHINING (02 years contract)
05-23-2020 | Posted inBolt Torquing & Tensioning Services for Khursniyah Gas Plant for a period of two years contract